Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-27-1208-MCCA1-MCCA1-134351

Header Information

Bid Number: BD-27-1208-MCCA1-MCCA1-134351 Description: V03 - Phase 1 Office Relocation Bid Opening Date: 11/12/2026 12:00:00 PM
Purchaser: Christopher Gong Organization: Massachusetts Convention Center Authority
Department: MCCA1 - Legal Location: MCCA1 - BCEC
Fiscal Year: 27 Type Code: NS - Non-Statewide Solicitation Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  10/14/2026 12:00:00 AM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A prebid conference will be held at 11:00am on October 21, 2026, starting at the MCCA Capital Projects Trailer located at 348 D Street, Boston, MA. The pre-bid conference will be followed by a walkthrough of the site.
Bulletin Desc: This project includes providing all labor, materials and equipment necessary to complete an interior renovation. This interior renovation is a Level 2 alteration. It will change an existing open office into an office suite with four individual offices and a meeting room. Contract documents for bidders will be available via the Authority's website rfp.massconvention.com.
Ship-to Address: Procurement Department
415 Summer Street
Boston, MA 02210
US
Email: Procurement@massconvention.com
Phone: (617) 954-2104
Bill-to Address: Procurement Department
415 Summer Street
Boston, MA 02210
US
Email: Procurement@massconvention.com
Phone: (617) 954-2104
Print Format: Bid Print
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 72-13  -  00 )   This project includes providing all labor, materials and equipment necessary to complete an interior renovation. This interior renovation is a Level 2 alteration. It will change an existing open office into an office suite with four individual offices and a meeting room. The adjacent copy room will shrink to accommodate the new layout. Updates include electrical, HVAC, and fire protection infrastructure to serve the new spaces, as all more fully set forth in the Drawings and Notes.
U N S P S C Code: 72-13-00
   General building construction
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status