Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-26-1206-40000-40000-129025

Header Information

Bid Number: BD-26-1206-40000-40000-129025 Description: RFP 59-26 Everett Maintenance Facility Steampipe Replacement Bid Opening Date: 06/24/2026 02:30:00 PM
Purchaser: Katherine Kroeger Organization: Massachusetts Bay Transportation Authority
Department: 400000 - Procurement & Logistics Location: 40000 - 400000 Procurement & Logistics
Fiscal Year: 26 Type Code: NS - Non-Statewide Solicitation Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  05/13/2026 04:00:00 PM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc:
Ship-to Address: Bill-to Address: Print Format: Bid Print
File Attachments: RFP 59-26 Everett Maintenance Facility Steampipe Replacement.pdf
Appendix 1 RFP 59-26 Everett Maintenance Facility Steampipe Replacement Scope of Work.pdf
Appendix 2 Everett Steampipe Replacement Procurement Plans and Specs.pdf
Exhibit A - MBTA Minimum Insurance Requirements~7.pdf
Exhibit B - Prevailing Wage Data~5.pdf
Form C - Bidder Price Response~4.xlsx
Form D - Bidder Subcontractor Information Form.pdf
Site Visit Attendance Sheet 051926~1.pdf
Addendum 1~83.pdf
Addendum 2~63.pdf
Addendum 3~21.pdf
RFP 59_26 Bid Tabulation.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 06/03/2026 12:42:36 PM Attachment File Changes: Header 1. File 'Site Visit Attendance Sheet 051926~1.pdf': File 'Site Visit Attendance Sheet 051926~1.pdf' added .
2 06/05/2026 08:31:05 AM Bidders can assume normal working hours, and if they must perform some of the work at off hours due to the impact on operations, the MBTA will pay the delta in labor costs between overtime and straight time costs, based on certified payrolls. Attachment File Changes: Header 1. File 'Addendum 1~83.pdf': File 'Addendum 1~83.pdf' added .
3 06/05/2026 10:37:36 AM Bidders should assume normal working hours, however some areas of the facility that are sensitive to production may require work to be performed after 1 pm. If work has to be performed by the contractor during other-than-normal working hours, the MBTA will pay the delta in labor costs between overtime and straight time costs, based on certified payrolls. The MBTA considers work performed between 4 PM and 5 AM to be other-than-normal working hours. In all cases the contractor must coordinate the work in advance with the facility manager to minimize impact on operations. Attachment File Changes: Header 1. File 'Addendum 2~63.pdf': File 'Addendum 2~63.pdf' added .
4 06/09/2026 01:32:39 PM Calendar Update Attachment File Changes: Header 1. File 'Addendum 3~21.pdf': File 'Addendum 3~21.pdf' added .
5 06/09/2026 01:39:27 PM Header 1. Bid Opening Date changed from "06/10/2026 02:30:00 PM" to "06/24/2026 02:30:00 PM".
6 07/01/2026 01:32:00 PM Bid tabulation Attachment File Changes: Header 1. File 'RFP 59_26 Bid Tabulation.pdf': File 'RFP 59_26 Bid Tabulation.pdf' added .

Item Information

Item # 1:   ( 72-15  -  12 )   repairs to the steampipe system at our Everett Maintenance Facility
U N S P S C Code: 72-15-12
   Heating and cooling and air conditioning HVAC construction a
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status