Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-26-1025-DOCFS-9848-122529

Header Information

Bid Number: BD-26-1025-DOCFS-9848-122529 Description: DRM 2018-46 #10 Conduit Installation at NCCI Gardner Bid Opening Date: 11/25/2025 02:00:00 PM
Purchaser: Katherine Brosnihan Organization: Department of Correction
Department: DOCFS - DOC Fiscal Services Milford Location: 9848 - 9848 Capital - NCCI Gardner
Fiscal Year: 26 Type Code: NS - Non-Statewide Solicitation Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  11/04/2025 01:46:06 PM
Info Contact: katherine.a.brosnihan@doc.state.ma.us Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: There will be a mandatory site visit on Thursday, November 13, 2025 at 9:00AM at NCCI-Gardner, 500 Colony Road, Gardner, MA 01440. Contact Brandon Avila at 774-261-2471 for more information.
Bulletin Desc: Plans and specs will be available Thursday, November 6, 2025 at 12:00PM by emailing doc-drmbidrequests@doc.state.ma.us. Bid intent forms and completed entrance waivers are due Monday, -November 10, 2025 at 12:00PM by emailing doc-drmbidrequests@doc.state.ma.us. Questions are due Tuesday, November 18, 2025 by 3:00pm. Email Brandon.Avila@doc.state.ma.us and Steven.Lemmo@doc.state.ma.us.
Ship-to Address: DOC - NCCI Gardner - Capital
500 Colony Road
Gardner, MA 01440
US
Email: milfordap@state.ma.us
Phone: (978) 630-6000
Bill-to Address: DOC - Fiscal Services Milford
50 Maple Street, Suite 3
Milford, MA 01757
US
Email: milfordap@state.ma.us
Phone: (508) 422-3300
Print Format:
File Attachments: Bid Results
Bid Intent Form
Bid Package
Bidder Checklist
schedule-for-participation-by-mwbe-construction
Prevailing Wage Payroll Report Form
Prevailing Wage Statement of Compliance
Where to get plans and specs
WageSchedule 20251031154241
DRM 2018 46 10 Conduit Installation Pre Bid Site Walkthrough Sign in Sheet
Plan Holders List DRM 2018 46 10 Conduit Install NCCI
DRM 2018-46 10 Conduit Installation at NCCI - Addendum 1
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
SBPP (Small Business Purchasing Program) Eligible?: NO
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment # Amendment Date Amendment Note
1 11/07/2025 11:05:24 AM Amended to include prevailing wage Attachment File Changes: Header 1. File 'WageSchedule 20251031154241': File 'WageSchedule 20251031154241' added .
2 11/14/2025 10:29:13 AM Amended to include plan holders list and site visit attendees list. Attachment File Changes: Header 1. File 'DRM 2018 46 10 Conduit Installation Pre Bid Site Walkthrough Sign in Sheet': File 'DRM 2018 46 10 Conduit Installation Pre Bid Site Walkthrough Sign in Sheet' added . 2. File 'Plan Holders List DRM 2018 46 10 Conduit Install NCCI': File 'Plan Holders List DRM 2018 46 10 Conduit Install NCCI' added .
3 11/21/2025 01:46:37 PM Added Addendum 1 Attachment File Changes: Header 1. File 'DRM 2018-46 10 Conduit Installation at NCCI - Addendum 1': File 'DRM 2018-46 10 Conduit Installation at NCCI - Addendum 1' added .
4 11/28/2025 04:14:58 PM Amended to include bid opening results. Attachment File Changes: Header 1. File 'Bid Results': File 'Bid Results' added .

Item Information

Item # 1:   ( 39-13  -  17 )   Conduit Installation at NCCI Gardner. Install conduit, junction boxes and electrical systems.
U N S P S C Code: 39-13-17
   Wire raceways conduit and busways
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 39-12  -  00 )   Conduit Installation at NCCI Gardner. Install conduit, junction boxes and electrical systems.
U N S P S C Code: 39-12-00
   Electrical raceways
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status