You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-25-1020-DCRCU-DC260-108108
Time remaining
Header Information
Bid Number:
BD-25-1020-DCRCU-DC260-108108
Description:
Amelia Earhart Dam Control Tower Rehabilitation
Bid Opening Date:
10/31/2024 12:00:00 PM
Purchaser:
CAROL BERNARDI
Organization:
Department of Conservation and Recreation
Department:
DCRCU - DCR CONTRACTS UNIT
Location:
DC260 - Construction contracts unit
Fiscal Year:
25
Type Code:
SS - Statewide Solicitation
Allow Electronic Quote:
Yes
Alternate Id:
P15-2984-C3A
Required Date:
10/31/2024
Available Date :
09/30/2024 06:00:13 PM
Info Contact:
Contact CAROL BERNARDI at (617)312-6912
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
See Bid Express for details
Bulletin Desc:
Ship-to Address:
Robert Boncore
Department of Conservation & Recreation
10 Park Plaza
Suite 6620
Boston, MA 02116
US
Email: Robert.Boncore@mass.gov
Phone: (857) 354-1358
FAX: (617) 626-1449
Bill-to Address:
Robert Boncore
Department of Conservation & Recreation
10 Park Plaza
Suite 6620
Boston, MA 02116
US
Email: Robert.Boncore@mass.gov
Phone: (857) 354-1358
FAX: (617) 626-1449
Print Format:
File Attachments:
Contractor Signatory form
Environmental preferred products form
Prompt Pay Discount
Business Reference Form
Create a Quote Job Aid
instructions, Terms and Conditions 7-1-20
Updated Standard Contract Form 7-1-20.docx
Commonwealth Terms and Conditions for Information Technology Contracts 7-1-20.pdf
Updated EFT form.pdf
Mass W-9 Form April 2022.pdf
form_standard-contract (4).docx
instructions_standard-contract-form.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
SBPP (Small Business Purchasing Program) Eligible?:
YES
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Item Information
1-5 of 7
1
2
Item # 1: ( 72-10 - 16 )
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems. The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
U N S P S C Code:
72-10-16
Roofing and siding and sheet metal work
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 30-17 - 16 )
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems. The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
U N S P S C Code:
30-17-16
Windows
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 72-10 - 24 )
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems. The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
U N S P S C Code:
72-10-24
Painting and paper hanging
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 4: ( 24-10-16-01-0000 )
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems. The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
U N S P S C Code:
24-10-16
Lifting equipment and accessories
24-10-16-01
Elevators
24-10-16-01-0000
Elevators
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 5: ( 46-19 - 00 )
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems. The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
U N S P S C Code:
46-19-00
Fire protection
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
1-5 of 7
1
2
Quote #
Description
Date Last Modified
Status