Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-24-1827-FISD1-PD001-107874

Header Information

Bid Number: BD-24-1827-FISD1-PD001-107874 Description: Boiler Removal & Replacement Bid Opening Date: 10/09/2024 10:00:00 AM
Purchaser: Charles Mihos Organization: Lynn Housing Authority & Neighborhood Development
Department: FISD1 - Fiscal Department Location: PD001 - Procurement
Fiscal Year: 24 Type Code: NS Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  09/25/2024 10:00:00 AM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A pre-bid conference will be held on October 1, 2024 at 10:00 AM, at M. Henry Wall Plaza, 18 Bond Street, Lynn, MA 01902. Attendance at the pre-bid conference is not a mandatory requirement for bidding.
Bulletin Desc: The Lynn Housing Authority & Neighborhood Development (LHAND) invites sealed bid proposals for the removal and replacement of one (1) boiler located at 18 Bond Street, Lynn, MA 01902. Copies of the bid requirements may be obtained by contacting Charles J. Mihos, Procurement Manager, at cmihos@lhand.org
Ship-to Address: Charles Mihos
92 Curwin Circle
Lynn, MA 01902
US
Email: cmihos@lhand.org
Phone: (339) 883-2623
Bill-to Address: Charles Mihos
10 Church Street
Lynn, MA 01902
US
Email: cmihos@lhand.org
Phone: (781) 598-3434
Print Format: Bid Print
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 72-15-10-02-0000 )   The Lynn Housing Authority & Neighborhood Development invites sealed bid proposals for the removal and replacement of one boiler located at 18 Bond Street, Lynn, MA 01902. Copies of the bid requirements may be obtained by contacting Charles J. Mihos, Procurement Manager, at cmihos@lhand.org or by visiting the LHAND procurement office located at 92 Curwin Circle, Lynn, MA 01905. Requirements to bid include: 50 percent Payment Bond, and a 5 percent of the value of the total bid deposit. Prevailing wages are required for this project as well.
U N S P S C Code: 72-15-10
   Boiler and furnace construction and maintenance services
  72-15-10-02
    Boiler installation and setup service
  72-15-10-02-0000
    Boiler installation and setup service
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0      
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status