You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-24-1607-MAINT-MAINT-98722
Header Information
Bid Number:
BD-24-1607-MAINT-MAINT-98722
Description:
Dana court Boiler and DHW pipe replacement
Bid Opening Date:
03/14/2024 02:00:00 PM
Purchaser:
Sharif Omer
Organization:
Waltham Housing Authority
Department:
MAINT - Maintenance
Location:
MAINT - Maintenance
Fiscal Year:
24
Type Code:
SS
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
03/14/2024
Available Date :
02/20/2024 03:44:54 PM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
PRE-BID CONFERENCE / SITE VISIT: Scheduled Date and Time: 03/07/2024 at 9:00AM EST Address: 24 Lowell Street, Waltham, MA 02453 Instructions: None
Bulletin Desc:
The WALTHAM HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Boiler & DHW Pipe Replacement ? Dana Court ? EMG at State Aided Development: Dana Court (200-3 in Waltham, Massachusetts, in accordance with the documents prepared by NORIAN/SIANI ENGINEERING, INC. The Project consists of but not limited to: Boiler & DHW Pipe Replacement - Dana Court - EMG. The construction will be administered using BidDocs construction software paid for by the Awarding Au
Ship-to Address:
Mark Johnson
110 Pond St
Waltham, MA 02451
US
Email: markj@walhouse.org
Phone: (781)899-6363
FAX: (781)894-7595
Bill-to Address:
Mark Johnson
110 Pond Street
Waltham, MA 02451
US
Email: markj@walhouse.org
Phone: (781)894-3357
FAX: (781)894-7595
Print Format:
Bid Print
File Attachments:
Dana Court Boiler and DHW piping Project
Form Attachments:
Required Quote Attachments
Item Information
Item # 1: ( 72-13 - 15 )
The WALTHAM HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Boiler & DHW Pipe Replacement ? Dana Court ? EMG at State Aided Development: Dana Court (200-3 in Waltham, Massachusetts, in accordance with the documents prepared by NORIAN/SIANI ENGINEERING, INC. The Project consists of but not limited to: Boiler & DHW Pipe Replacement - Dana Court - EMG. The construction will be administered using BidDocs construction software paid for by the Awarding Au
U N S P S C Code:
72-13-15
Residential construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status