You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-24-1607-MAINT-MAINT-95720
Header Information
Bid Number:
BD-24-1607-MAINT-MAINT-95720
Description:
Federal Pacific Breaker Panel and main switch replacment
Bid Opening Date:
01/12/2024 10:00:00 AM
Purchaser:
Sharif Omer
Organization:
Waltham Housing Authority
Department:
MAINT - Maintenance
Location:
MAINT - Maintenance
Fiscal Year:
24
Type Code:
SS
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
01/12/2024
Available Date :
12/06/2023 08:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Dec. 13, 2023 refer to Bid Docs Ad
Bulletin Desc:
Waltham Housing authority is seeking Qualified Bids for the replacement of Federal Pacific Panels and main switch for the Orange Street 667-4 Elderly development, located at 82-86 Orange Street, Waltham, MA 02451. The proposed scope includes replacing (32) 100A apartment load centers, (5) 100A panels, (2) 400A distribution boards, (1) 1200A distribution board, and (1) 800A main switch. The contractor shall be responsible for proper removal and disposal of wall joint compound containing greater t
Ship-to Address:
Mark Johnson
110 Pond St
Waltham, MA 02451
US
Email: markj@walhouse.org
Phone: (781)899-6363
FAX: (781)894-7595
Bill-to Address:
Mark Johnson
110 Pond Street
Waltham, MA 02451
US
Email: markj@walhouse.org
Phone: (781)894-3357
FAX: (781)894-7595
Print Format:
Bid Print
File Attachments:
Federal Pacific Panel, Breaker and Electrical Replacement
Form Attachments:
Required Quote Attachments
Item Information
Item # 1: ( 72-13 - 00 )
Advertisement:- Estimated Cost of Contract: 908,981.79 Waltham Housing authority is seeking Qualified Bids for the replacement of Federal Pacific Panels and main switch for the Orange Street 667.4 Elderly development, located at 82.86 Orange Street, Waltham, MA 02451. The proposed scope includes replacing 32 100A apartment load centers, 5- 100A panels, 2- 400A distribution boards, 1- 1200A distribution board, and 1-800A main switch. The contractor shall be responsible for proper removal and disposal of wall joint compound containing greater than 2 percent asbestos containing materials as required to facilitate system replacements on site. There will be an optional bidders conference held on December 13 2023, t 1000am for interested parties.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status