You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-24-1429-TABOS-TABOS-97750
Header Information
Bid Number:
BD-24-1429-TABOS-TABOS-97750
Description:
Track and Field Complex, Medway High School
Bid Opening Date:
02/16/2024 02:00:00 PM
Purchaser:
Allison Potter
Organization:
Town of Medway
Department:
TABOS - Town Administrator
Location:
TABOS - Town Administrator
Fiscal Year:
24
Type Code:
NS
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
01/31/2024 02:00:00 PM
Info Contact:
www.westongraphics.com
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
2/7/24, 10AM at Hanlon Track & Field Complex, Medway High School, 88 Summer St, Medway, MA 02053
Bulletin Desc:
Hanlon Track & Field Complex reconstruction, Medway High School; project includes synthetic turf replacement at stadium field, reconstructed track, associated improvements. Sealed bids for the general contract must be filed with Town of Medway, DPW Office, Medway Middle School, 45B Holliston St, Door 9, Medway, MA, no later than 2/16/24, 2PM. Bid document available at Westongraphics.com after 2PM on 1/31/24. The Select Board awards the contract.
Ship-to Address:
A Potter
155 Village Street
Medway, MA 02053
US
Email: ta@townofmedway.org
Phone: (508)533-3264
FAX: (508)321-4988
Bill-to Address:
A Potter
155 Village Street
Medway, MA 02053
US
Email: ta@townofmedway.org
Phone: (508)533-3264
FAX: (508)321-4988
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 72-15 - 31 )
IFB for Hanlon Track & Field Complex reconstruction, Medway High School; project includes synthetic turf replacement at stadium field, reconstructed track, and associated improvements. Sealed bids for the general contract must be filed with Town of Medway, DPW Office, Medway Middle School, 45B Holliston St, Door 9, Medway, MA, no later than 2/16/24, 2PM. Bid document available at Westongraphics.com after 2PM on 1/31/24. Tentative construction dates: start 6/3/24 with substantial completion by 9/20/24, final completion 10/4/24. The Select Board awards the contract.
U N S P S C Code:
72-15-31
Athletic and recreational facility construction services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status