You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-24-1155-COM01-COMPW-100156
Header Information
Bid Number:
BD-24-1155-COM01-COMPW-100156
Description:
2024 Water Main Improvements, Sewall Woods Rd and Maple Rd, Contract No. 10
Bid Opening Date:
04/18/2024 10:00:00 AM
Purchaser:
Jennifer Rosa
Organization:
City of Melrose
Department:
COM01 - City of Melrose Public Works
Location:
COMPW - Public Works
Fiscal Year:
24
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
Required Date:
03/20/2024
Available Date :
03/20/2024 10:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
None
Bulletin Desc:
The work consists of the construction of approximately 1,600 linear feet of 8-inch diameter ductile iron water main and service connections on Sewall Woods Road and Maple Road. Additive Alternate A includes an additional 325 linear feet of 8-inch diameter ductile iron water main and service connections to be installed on Sewall Woods Road. All water mains shall be furnished and installed with associated valves, fittings, and hydrants.
Ship-to Address:
Elena Proakis Ellis
562 Main Street
Engineering Depatment Basement
MA
Melrose , MA 02176
US
Email: eproakis@CityofMelrose.org
Phone: (781)979-4500
Bill-to Address:
Tina Bright
72 Tremont Street
Melrose, MA 02176
US
Email: tbright@cityofmelrose.org
Phone: (781)665-0142
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 83-10 - 15 )
The work of this contract generally consists of the construction of new water main in the City of Melrose. Approximately 1,600 linear feet of 8-inch diameter ductile iron water main shall be installed on Sewall Woods Road and Maple Road. Additive Alternate A generally includes an additional 325 linear feet of 8-inch diameter ductile iron water main to be installed on Sewall Woods Road. All water mains shall be furnished and installed with associated valves, fittings, and hydrants. Temporary bypass piping shall be used during the construction of the water main where specified herein. All service connections are to be completed after the water main successfully passes the pressure testing and chlorination procedures.Contract Documents shall be made available by contacting the DPW Engineering Division at 781-979-4172 or emailing jrosa@cityofmelrose.org. on or after 10:00 A.M. on Wednesday, March 20, 2024.
U N S P S C Code:
83-10-15
Water and sewer utilities
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status