You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-24-1148-FRRA-FRRA-100693
Header Information
Bid Number:
BD-24-1148-FRRA-FRRA-100693
Description:
RFP #24-07 Development Plan for Northfield Point at 600 Davol Street and Three Mooring Fields
Bid Opening Date:
04/18/2024 02:00:00 PM
Purchaser:
KAREN MARTIN
Organization:
City of Fall River
Department:
FRRA - FALL RIVER DEVELOPMENT AUTHORIY
Location:
FRRA - FALL RIVER REDEVELOPMENT AUTHORITY
Fiscal Year:
24
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
RFP #24-07
Required Date:
03/27/2024
Available Date :
03/27/2024 12:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
None
Bulletin Desc:
The Fall River Redevelopment Authority is seeking a design and engineering firm experienced in coastal land improvements and design of mooring fields to contract for 1) Plan improvements for an overgrown spit of land, a part of the City Pier/600 Davol St. property, to replace invasive species with native vegetation and repair a deteriorated and eroding embankment to create a new fishing and recreation area while restoring the shoreline ecology, 2) The addition of three new mooring fields a
Ship-to Address:
SARAH PAGE
ONE GOVERNMENT CENTER
ROOM 610
FALL RIVER, MA 02722
US
Email: spage@fallriverma.gov
Phone: (508)324-2000 Ext. 3635
Bill-to Address:
SARAH PAGE
ONE GOVERNMENT CENTER
ROOM 610
FALL RIVER, MA 02722
US
Email: spage@fallriverma.gov
Phone: (508)324-2000 Ext. 3635
Print Format:
Bid Print
File Attachments:
RFP #24-07
Form Attachments:
Required Quote Attachments
Item Information
Item # 1: ( 81-10 - 00 )
The Fall River Redevelopment Authority is seeking a design and engineering firm experienced in coastal land improvements and design of mooring fields to contract 1. Plan improvements for an overgrown spit of land a part of the City Pier - 600 Davol Street property to replace invasive species with native vegetation and repair a deteriorated and eroding embankment to create a new fishing and recreation area while restoring the shoreline ecology, 2 The addition of three new mooring fields along Fall River's waterfront, 3 Assess plan and design dinghy docks to accommodate dinghies from the added boat moorings in the new mooring fields and 4 Develop a Bid Package for public procurement for the construction of all elements of work with the scope of this RFP 24-07.
U N S P S C Code:
81-10-00
Professional engineering services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status