You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-24-1142-PFD01-PFD01-97638
Header Information
Bid Number:
BD-24-1142-PFD01-PFD01-97638
Description:
Irving Reconfiguration Prequalified Only-Project No. 7258
Bid Opening Date:
02/07/2024 12:00:00 PM
Purchaser:
BID COUNTER
Organization:
City of Boston
Department:
PFD01 - Public Facilities Department
Location:
PFD01 - Public Facilities Department
Fiscal Year:
24
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
12/29/2023 12:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
This project has prequalified firms that submitted Statements of Qualifications per the prior advertisement. This project is not seeking new bidders. The scope of work is further detailed in the specification and includes project consists of the existing Washington Irving Elementary School Project shall be fully renovated and provided with a three (3) story new addition.
Ship-to Address:
Rita Gorman
2 Center Plaza, Suite 700
Boston, MA 02108
US
Email: bid.info@boston.gov
Phone: (617)635-4809
Bill-to Address:
PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
Print Format:
Bid Print
File Attachments:
Advertisement
Form Attachments:
Required Quote Attachments
Item Information
Item # 1: ( 72-15 - 00 )
This project has prequalified firms that submitted Statements of Qualifications per the prior advertisement. This project is not seeking new bidders. The scope of work is further detailed in the specification and includes project consists of the existing Washington Irving Elementary School Project shall be fully renovated and provided with a three (3) story new addition.
U N S P S C Code:
72-15-00
Specialized trade construction and maintenance services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
0.1
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 72-13 - 00 )
This project has prequalified firms that submitted Statements of Qualifications per the prior advertisement. This project is not seeking new bidders. The scope of work is further detailed in the specification and includes project consists of the existing Washington Irving Elementary School Project shall be fully renovated and provided with a three (3) story new addition.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
0.1
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 72-14 - 00 )
This project has prequalified firms that submitted Statements of Qualifications per the prior advertisement. This project is not seeking new bidders. The scope of work is further detailed in the specification and includes project consists of the existing Washington Irving Elementary School Project shall be fully renovated and provided with a three (3) story new addition.
U N S P S C Code:
72-14-00
Heavy construction services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
0.1
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status