You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-24-1019-DCP04-BID01-92982
Header Information
Bid Number:
BD-24-1019-DCP04-BID01-92982
Description:
DFS2002 - Request for Qualifications for Trade Contractors, Fire Services SE Campus, Bridgewater, MA
Bid Opening Date:
09/29/2023 12:00:00 PM
Purchaser:
James Hohmann
Organization:
Division of Capital Asset Management and Maintenance
Department:
DCP04 - Bid Room
Location:
BID01 - Bid Room
Fiscal Year:
24
Type Code:
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
09/13/2023 08:30:00 AM
Info Contact:
Contact DCAMM Bid Room at (617) 727-4003
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
Request for Qualifications for Trade Contractors for Three (3) Trade Contractor Packages: Miscellaneous and Ornamental Iron ($790,000); Plumbing ($58,000); Electrical ($1,056,639), for Fire Services SE Campus, Site Infrastructure and Burn Building, Bridgewater, MA.
Ship-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Bill-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Print Format:
File Attachments:
Legal Ad
Form Attachments:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
NO
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment #
Amendment Date
Amendment Note
1
09/25/2023 01:59:32 PM
Header 1. Bulletin Desc changed from "Request for Qualifications for Trade Contractors for Four (4) Trade Contractor Packages: Masonry ($1,518,985); Miscellaneous and Ornamental Iron ($790,000); Plumbing ($58,000); Electrical ($1,056,639), for Fire Services SE Campus, Site Infrastructure and Burn Building, Bridgewater, MA." to "Request for Qualifications for Trade Contractors for Three (3) Trade Contractor Packages: Miscellaneous and Ornamental Iron ($790,000); Plumbing ($58,000); Electrical ($1,056,639), for Fire Services SE Campus, Site Infrastructure and Burn Building, Bridgewater, MA.". Item 1 1. Item 1 cancelled. Item 2 1. Item 2 added.
Item Information
Item # 1: ( 72-13 - 00 )
Request for Qualifications for Trade Contractors for Four (4) Trade Contractor Packages: Masonry ($1,518,985); Miscellaneous and Ornamental Iron ($790,000); Plumbing ($58,000); Electrical ($1,056,639), for Fire Services SE Campus, Site Infrastructure and Burn Building, Bridgewater, MA. This Project is Phase 1 Construction of the Fire Services SE Campus located in Bridgewater, MA. This first phase of a long-term build out will include demolition of existing dormitory buildings, construction of new site utilities and infrastructure, and construction of a new Class A Burn Building Prop.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
EA - Each
Item Canceled
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 72-13 - 00 )
Request for Qualifications for Trade Contractors for Three (3) Trade Contractor Packages: Miscellaneous and Ornamental Iron ($790,000); Plumbing ($58,000); Electrical ($1,056,639), for Fire Services SE Campus, Site Infrastructure and Burn Building, Bridgewater, MA. This Project is Phase 1 Construction of the Fire Services SE Campus located in Bridgewater, MA. This first phase of a long-term build out will include demolition of existing dormitory buildings, construction of new site utilities and infrastructure, and construction of a new Class A Burn Building Prop.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status