You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-23-2147-AWD02-AWD-83464
Header Information
Bid Number:
BD-23-2147-AWD02-AWD-83464
Description:
North Acton Water Treatment Plant SUEZ PFAS Treatment Upgrade
Bid Opening Date:
03/02/2023 11:00:00 AM
Purchaser:
Matthew Mostoller
Organization:
Water Supply District of Acton
Department:
AWD02 - Acton Water District
Location:
AWD - Acton Water District
Fiscal Year:
23
Type Code:
SS
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
01/18/2023 12:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A pre-bid conference for the Project will be held on Tuesday, January 31st, 2023, at 10:00 AM at the North Acton WTP, 960 Main Street, Acton, MA 01720. Attendance at the pre-bid conference is encouraged but not required.
Bulletin Desc:
Information and Bidding Documents for the Project may be downloaded at no cost at the following designated website: https://www.wright-pierce.com/projects
Ship-to Address:
Matthew Mostoller
693 Massachusetts Avenue
P.O. Box 953
Acton, MA 01720
US
Email: matt@actonwater.com
Phone: (978)263-9107
FAX: (978)264-0148
Bill-to Address:
Matthew Mostoller
693 Massachusetts Avenue
P.O. Box 953
Acton, MA 01720
US
Email: matt@actonwater.com
Phone: (978)263-9107
FAX: (978)264-0148
Print Format:
Required Quote Attachments
Item Information
Item # 1: ( 72-13 - 17 )
Constructing the North Acton Water Treatment Plant SUEZ PFAS Treatment Upgrade. It shall be located at 960 Main Street in Acton, MA, at the existing North Acton Water Treatment Plant site. The project shall include installation of a process transfer pumping system, PFAS equalization tank, two PFAS treatment containers (provided by others), interior process piping, site piping, and ancillary equipment and controls. The work shall also include all site restoration and miscellaneous work and cleanup necessary to provide a complete and fully operational water treatment plant following the upgrades. The time for substantial completion of this contract is 300 calendar days and final completion is 365 calendar days.
U N S P S C Code:
72-13-17
Infrastructure construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status