You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-23-1432-ARLTN-ARLTN-85089
Header Information
Bid Number:
BD-23-1432-ARLTN-ARLTN-85089
Description:
Fire alarm system upgrade Arlington Housing Authority.
Bid Opening Date:
03/30/2023 11:00:00 AM
Purchaser:
Chris Partridge
Organization:
Arlington Housing Authority
Department:
ARLTN - Arlington Housing Authority
Location:
ARLTN - Arlington Housing Authority
Fiscal Year:
23
Type Code:
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
02/28/2023 12:00:00 AM
Info Contact:
jnagle@arlingtonhousing.org
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
PRE-BID CONFERENCE / SITE VISIT: Date and Time: Tuesday, 14 March 2023 at 10:00 AM Address: 18 Drake Road At the front of building 30, Arlington Instructions: Bring business card for attendance and mask
Bulletin Desc:
The Project consists of: provide new addressable fire alarm system in all (9) buildings interconnected utilizing underground conduit. Replace all FPE unit load centers with new and provide each building with a new house panel. Asbestos abatement is required. Documents will be uploaded to Biddocs on 3/8.
Ship-to Address:
Chris Partridge
4 Winslow Street
Arlington, MA 02474
US
Email: cpartridge@arlingtonhousing.org
Phone: (781)539-3879
Bill-to Address:
Chris Partridge
4 Winslow Street
Arlington, MA 02474
US
Email: cpartridge@arlingtonhousing.org
Phone: (781)539-3879
Print Format:
Bid Print
File Attachments:
AD.docx
Form Attachments:
Required Quote Attachments
Amendments:
Amendment #
Amendment Date
Amendment Note
1
03/02/2023 12:29:25 PM
Header 1. Bulletin Desc changed from "The Project consists of: provide new addressable fire alarm system in all (9) buildings interconnected utilizing underground conduit. Replace all FPE unit load centers with new and provide each building with a new house panel. Asbestos abatement is required." to "The Project consists of: provide new addressable fire alarm system in all (9) buildings interconnected utilizing underground conduit. Replace all FPE unit load centers with new and provide each building with a new house panel. Asbestos abatement is required. Documents will be uploaded to Biddocs on 3/8.".
Item Information
Item # 1: ( 46-19 - 00 )
The Project consists of: provide new addressable fire alarm system in all (9) buildings interconnected utilizing underground conduit. Replace all FPE unit load centers with new and provide each building with a new house panel. Asbestos abatement is required.
U N S P S C Code:
46-19-00
Fire protection
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status