You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-23-1206-31100-31102-87817
Header Information
Bid Number:
BD-23-1206-31100-31102-87817
Description:
MBTA Arborway Bus Facility Crew Quarters
Bid Opening Date:
06/01/2023 02:00:00 PM
Purchaser:
ALLISON SWEENEY
Organization:
Massachusetts Bay Transportation Authority
Department:
311002 - Capital Delivery
Location:
31102 - Design and Construction
Fiscal Year:
23
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
04/26/2023 09:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A prebid conference will be held on May 11, 2023, at 2:00 p.m. as a virtual online meeting. Details regarding the pre-bid conference will be provided upon request of the specifications.
Bulletin Desc:
Work consists of the construction of a building for the occupancy and use of the MBTA staff at the Arborway Bus Maintenance Facility located at Washington Street and Arborway in Boston, near Forest Hills station. The building will be constructed immediately adjacent to the existing mobile trailers now in use. The building will be approximately 36 ft x 73 ft. Site work from excavation, pavement restoration, utility connections, and removal/demolition of the existing (triple-wide) crew quarters
Ship-to Address:
Design and Construction
10 Park Plaza
Suite 5170
Boston, MA 02116
US
Email: info@mbta.com
Phone: (617)222-5955
Bill-to Address:
MBTA
10 Park Plaza
Accounts PayableDepartment
Boston, MA 02116
US
Email: invoices@mbta.com
Phone: (617)222-3235
Print Format:
Bid Print
Required Quote Attachments
Amendments:
Amendment #
Amendment Date
Amendment Note
1
05/24/2023 01:02:58 PM
Header 1. Bid Opening Date changed from "05/25/2023 02:00:00 PM" to "06/01/2023 02:00:00 PM".
Item Information
Item # 1: ( 72-13 - 00 )
Work consists of the construction of a building for the occupancy and use of the MBTA staff at the Arborway Bus Maintenance Facility located at Washington Street and Arborway in Boston, near Forest Hills station. The building will be constructed immediately adjacent to the existing mobile trailers now in use. The building will be approximately 36 ft x 73 ft. Site work from excavation, pavement restoration, utility connections, and removal/demolition of the existing (triple-wide) crew quarters
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status