You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-23-1147-COE25-COE25-88051
Header Information
Bid Number:
BD-23-1147-COE25-COE25-88051
Description:
23-01 Island End River Flood
Bid Opening Date:
05/24/2023 01:00:00 PM
Purchaser:
Allison Jenkins
Organization:
City of Everett
Department:
COE25 - DPW
Location:
COE25 - DPW
Fiscal Year:
23
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
05/03/2023 09:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
None
Bulletin Desc:
The Cities of Chelsea and Everett propose to construct a coastal flood barrier, Storm Surge Control Facility, and related amenities at IER in the Cities of Chelsea and Everett (the ?Project Site?). The approximately 5.6-acre Project Site is currently comprised of a mix of commercial and industrial uses and supporting roadway and utility infrastructure. The proposed IER Flood Resilience Project (the ?Project?) will construct an approximately 4,640 linear-foot (?lf?) flood barrier,
Ship-to Address:
Allison Jenkins
City of Everett
484 Broadway
Room 14 - Purchasing
Everett, MA 02149
US
Email: allison.jenkins@ci.everett.ma.us
Phone: (617)394-2288
Website: https://cityofeverett.com
Bill-to Address:
Allison Jenkins
City of Everett
484 Broadway
Room 14 - Purchasing
Everett, MA 02149
US
Email: allison.jenkins@ci.everett.ma.us
Phone: (617)394-2288
Website: https://cityofeverett.com
Print Format:
Bid Print
File Attachments:
23-01 Newspaper Ad.docx
Form Attachments:
Required Quote Attachments
Item Information
Item # 1: ( 81-10 - 00 )
The Cities of Chelsea and Everett propose to construct a coastal flood barrier, Storm Surge Control Facility, and related amenities at IER in the Cities of Chelsea and Everett. The approximately 5.6-acre Project Site is currently comprised of a mix of commercial and industrial uses and supporting roadway and utility infrastructure. The proposed IER Flood Resilience Project will construct an approximately 4,640 linear-foot flood barrier, an approximately 2,900 square-foot underground Storm Surge Control Facility, approximately 50,000 square feet of nature-based solutions along the riverfront, and associated wetland and public access improvements along the IER.
U N S P S C Code:
81-10-00
Professional engineering services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status