You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-22-1270-TOF01-TOF01-83207
Header Information
Bid Number:
BD-22-1270-TOF01-TOF01-83207
Description:
The City of Framingham, through the Mayor of Framingham Massachusetts, the Awarding Authority invite
Bid Opening Date:
02/01/2023 10:00:00 AM
Purchaser:
Amy Putney
Organization:
City of Framingham
Department:
TOF01 - Purchasing
Location:
TOF01 - Purchasing Dept
Fiscal Year:
22
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
01/18/2023 10:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
The City of Framingham, through the Mayor of Framingham Massachusetts, the Awarding Authority invites sealed bids for IFB# 7798 Re-Bid Walsh window replacement and Exterior wall repair. The Window Replacement and Exterior Wall Repairs at the Walsh Middle School project includes masonry and concrete repairs,
Ship-to Address:
Jennifer Pratt
150 Concord Street
Room #127
Framingham, MA 01702
US
Email: jap@framinghamma.gov
Phone: (508)532-5405
Bill-to Address:
Jennifer Pratt
150 Concord Street
Room #127
Framingham, MA 01702
US
Email: jap@framinghamma.gov
Phone: (508)532-5405
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 72-13 - 00 )
The City of Framingham, through the Mayor of Framingham Massachusetts, the Awarding Authority invites sealed bids for IFB# 7798 Re-Bid Walsh window replacement and Exterior wall repair. The Window Replacement and Exterior Wall Repairs at the Walsh Middle School project includes masonry and concrete repairs, the removal of concrete fins between window units, abatement and replacement of perimeter masonry and window sealant joints, encapsulating designated existing sealants to remain, installation of pre-cured silicone membrane over window frame elements, and the replacement of windows.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status