You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-22-1240-TOA01-TOA01-83156
Header Information
Bid Number:
BD-22-1240-TOA01-TOA01-83156
Description:
Andover Town Offices, IFB 185/023/23
Bid Opening Date:
02/09/2023 02:00:00 PM
Purchaser:
Janet Brewer
Organization:
Town of Andover
Department:
TOA01 - Purchasing
Location:
TOA01 - Purchasing
Fiscal Year:
22
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
01/18/2023 09:00:00 AM
Info Contact:
Theresa Peznola, theresa.peznola@andoverma.gov
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A MANDATORY Pre-Bid Walk through will be held on Thursday, January 26, 2023, at 7:00 AM. Location: Town Offices , 36 Bartlet St., Andover, MA, 01810. Meet under the awning in front of building.
Bulletin Desc:
Bid Docs will be available through BidDocs online, at www.biddocs.com, project B23-LKS9 or search Andover Town Offices. This project is for renovation of third floor of Town Offices.
Ship-to Address:
Theresa Peznola
36 Bartlet St.
3rd floor
Andover, MA 01810
US
Email: theresa.peznola@andoverma.us
Phone: (978)623-8951
Bill-to Address:
Theresa Peznola
36 Bartlet St.
3rd floor
Andover, MA 01810
US
Email: theresa.peznola@andoverma.us
Phone: (978)623-8951
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 72-13 - 16 )
Bid Docs will be available through BidDocs online, at www.biddocs.com, project B23-LKS9 or search Andover Town Offices. This project is for renovation of third floor of Town Offices. There are 8 Filed Sub bid categories: Acoustical Tile, Electrical, Fire Protection, Glass & Glazing, HVAC, Masonry, Painting, & Resilient Floors. DCAMM Certification & Update Statement required . Filed Sub Bids due 2/9/23 @ 2:00 PM. The General Bids require DCAMM Certification & Update Statement in General Building Construction. General Bids are due 2/23/23 @ 2:00 PM.
U N S P S C Code:
72-13-16
Commercial or industrial construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status