Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-22-1066-MCC01-MCC01-64374

Time remaining

Header Information

Bid Number: BD-22-1066-MCC01-MCC01-64374 Description: MCC Federal Building RTU and Boiler Replacement Project Bid Opening Date: 08/05/2021 11:00:00 AM
Purchaser: Kirsten Grueter Organization: Middlesex Community College
Department: MCC01 - Middlesex Community College Location: MCC01 - Purchasing
Fiscal Year: 22 Type Code: Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  07/07/2021 08:00:00 AM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: The Pre-Bid Conference and site visit will be held on July 14, 2021 at 10:30 a.m. at the Federal Building. Attendees must wear masks and follow MCC direction for viewing the building. Federal Building 50 Kearney Square, Lowell MA 01852
Bulletin Desc: The Project consists of: Boiler Replacement , RTU Replacement and HVAC upgrades AND Associated Repairs. see attached document for details. Sub-bids will be received until 7/22/21 at 11:00AM>
Ship-to Address: Christina Kelley
591 Springs Road
Bedford, MA 01730
US
Email: kelleyca@middlesex.mass.edu
Phone: (781) 280-3526
FAX: (781) 280-3533
Bill-to Address: Christina Kelley
591 Springs Road
Bedford, MA 01730
US
Email: kelleyca@middlesex.mass.edu
Phone: (781) 280-3526
FAX: (781) 280-3533
Print Format:
File Attachments: MCC Federal Building RTU and Boiler Replacement Project.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 72-15  -  12 )   The Project consists of: Boiler Replacement , RTU Replacement and HVAC upgrades AND Associated Repairs
U N S P S C Code: 72-15-12
   Heating and cooling and air conditioning HVAC construction a
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 30-16  -  16 )   The Project consists of: Boiler Replacement , RTU Replacement and HVAC upgrades AND Associated Repairs
U N S P S C Code: 30-16-16
   Ceiling materials
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 72-10  -  23 )   The Project consists of: Boiler Replacement , RTU Replacement and HVAC upgrades AND Associated Repairs
U N S P S C Code: 72-10-23
   Plumbing and heating and air conditioning
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 26-12  -  00 )   The Project consists of: Boiler Replacement , RTU Replacement and HVAC upgrades AND Associated Repairs
U N S P S C Code: 26-12-00
   Electrical wire and cable and harness
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status