Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-22-1030-0T100-0T100-70022

Time remaining

Header Information

Bid Number: BD-22-1030-0T100-0T100-70022 Description: RAIL CAPE MAIN AND FALMOUTH LINE TIE INSTALLATION PROJECT Bid Opening Date: 02/08/2022 02:00:00 PM
Purchaser: Monica Auguste Organization: Department of Transportation
Department: 0T100 - RAIL AND TRANSIT Location: 0T281 - RAIL Departmental Contracts
Fiscal Year: 22 Type Code: NS - Non-Statewide Solicitation Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  01/10/2022 12:06:50 PM
Info Contact: Rob Finley at rcfinley@verizon.net. Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: The Pre-Bid Meeting Mass Coastal RR offices at 12 Harding St., Unit 202, Lakeville, MA 02347 on Friday, January 21, 2022 at 9 am Attendance at the pre-bid meeting and hi-rail inspection is mandatory (see notice)
Bulletin Desc: Notice to Bidders The Massachusetts Department of Transportation Rail and Transit Division (MassDOT or Owner) is seeking Contractors for the following tie installation work on the Cape Main and Falmouth Line:
Ship-to Address: Chief Financial Office Unit
10 Park Plaza
Boston, MA 02116
US
Email: Noname@state.ma.us
Phone: (999) 999-9999
Bill-to Address: Chief Financial Office Unit
10 Park Plaza
Boston, MA 02116
US
Email: Noname@state.ma.us
Phone: (999) 999-9999
Print Format:
File Attachments: Notice to Bidders 1-05-22.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
SBPP (Small Business Purchasing Program) Eligible?: YES
See SBPP requirements and exceptions at www.mass.gov/sbpp :

Item Information

1-5 of 8
1  2 
Item # 1:   ( 25-12-17-00-0000 )   The Massachusetts Department of Transportation (MassDOT) rail division is soliciting bids for the acquisition of timber crossties as described in the technical specification that follows. These Specifications describe requirements for the procurement of timber crossties to be used on the rail lines owned by the Massachusetts Department of Transportation (MassDOT). Crossties shall meet, in every respect, Specifications of the American Railway Engineering and Maintenance-of-Way Association (AREMA) contained in the Manual for Railway Engineering, Volume 1, Chapter 30, Part 3, as modified by the Technical Specifications herein.
U N S P S C Code: 25-12-17
   Railroad support equipment and systems
  25-12-17-00
    Railroad support equipment and systems
  25-12-17-00-0000
    Railroad support equipment and systems
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0      
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 25-12-17-00 )   25-12-17-00 : Railroad support equipment and systems
U N S P S C Code: 25-12-17
   Railroad support equipment and systems
  25-12-17-00
    Railroad support equipment and systems
  25-12-17-00
    Railroad support equipment and systems
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0      
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 72-14-16-03-0000 )   The Massachusetts Department of Transportation (MassDOT) rail division is soliciting bids for the acquisition of timber crossties
U N S P S C Code: 72-14-16
   Mass transit system construction services
  72-14-16-03
    Railroad and railway roadbed construction service
  72-14-16-03-0000
    Railroad and railway roadbed construction service
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0      
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 72-14-16-03 )   72-14-16-03 : Railroad and railway roadbed construction service
U N S P S C Code: 72-14-16-03
Qty Unit Cost UOM Total Discount Amt. Total Cost
This item is narrative
 
Item # 5:   ( 30-12-17-00-0000 )   The Massachusetts Department of Transportation (MassDOT) rail division is soliciting bids for the acquisition of timber crossties
U N S P S C Code: 30-12-17
   Road and railroad construction materials
  30-12-17-00
    Road and railroad construction materials
  30-12-17-00-0000
    Road and railroad construction materials
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0      
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 8
1  2 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status