You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-21-1534-TPS93-TPS93-88206
Header Information
Bid Number:
BD-21-1534-TPS93-TPS93-88206
Description:
School Based Health Center
Bid Opening Date:
06/07/2023 05:45:00 PM
Purchaser:
Brenda Moynihan
Organization:
Taunton Public Schools
Department:
TPS93 - Taunton Public Schools
Location:
TPS93 - Taunton Public Schools
Fiscal Year:
21
Type Code:
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
05/04/2023 03:00:00 PM
Info Contact:
Brenda Moynihan - bmoynihan@tauntonschools.org
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
PRE-BID CONFERENCE/SITE VISIT Scheduled Date and Time: 5/26/2023 @ 7:00 AM EDT Address: 60 Williams Street, Taunton, MA Instructions: None
Bulletin Desc:
The project consists of but not limited to: A vacant science lab is located on the first floor of the Parker Middle School, 60 Williams Street in Taunton. The area of renovation is about 1,100sf. A new 150 sf entry vestibule is added to the north side of the building with new stairs and a sidewalk connecting to an adjacent building entry and ramp are included in this project. Select renovations will be done.
Ship-to Address:
Brenda Moynihan
215 Harris Street
Taunton, MA 02780
US
Email: bmoynihan@tauntonschools.org
Phone: (508)821-1235
FAX: (508)821-1274
Bill-to Address:
Brenda Moynihan
215 Harris Street
Taunton, MA 02780
US
Email: bmoynihan@tauntonschools.org
Phone: (508)821-1235
FAX: (508)821-1274
Print Format:
Bid Print
File Attachments:
Project Manual Manet Community Health Vol 1 of 2
Project Manual Manet Community Health Vol 2 of 2
Taunton PS Bid Doc for School Based Health Center
Form Attachments:
Required Quote Attachments
Item Information
Item # 1: ( 30-19 - 00 )
The project consists of but not limited to: A vacant science lab is located on the first floor of the Parker Middle School, 60 Williams Street in Taunton. The area of renovation is about 1,100sf. A new 150 sf entry vestibule is added to the north side of the building with new stairs and a sidewalk connecting to an adjacent building entry and ramp are included in this project. Select renovations will be done.
U N S P S C Code:
30-19-00
Construction and maintenance support equipment
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status