You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-21-1369-MSCBA-MSCBA-101422
Header Information
Bid Number:
BD-21-1369-MSCBA-MSCBA-101422
Description:
MSCBA seeks written quotes for the replacement of existing exterior door(s) and hardware at Miles-Di
Bid Opening Date:
04/24/2024 05:00:00 PM
Purchaser:
KIARA TAYLOR
Organization:
Massachusetts State College Building Authority
Department:
MSCBA - Massachusetts State College Building Authority
Location:
MSCBA - Massachusetts State College Building Authority
Fiscal Year:
21
Type Code:
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
04/10/2024 04:51:16 PM
Info Contact:
ktaylor@mscba.org
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
April 16, 2024 at 10:00 AM. Meet in center plaza between Miles and DiNardo Hall 113 Burrill Ave., Bridgewater, MA 02324. Parking will be available in the Moakley Lot at 111 Burrill Ave.
Bulletin Desc:
MSCBA seeks written quotes for the replacement of existing exterior door(s) and hardware at Miles-DiNardo Hall. Door(s) will be replaced in order of campus priority and to theextent available funds allow.
Ship-to Address:
Ellen Bell
253 Summer Street
Suite 300
Boston, MA 02210
US
Email:
Phone: (617)933-8338
FAX: (617)977-9174
Website: http://www.mscba.org
Bill-to Address:
Ellen Bell
253 Summer Street
Suite 300
Boston, MA 02210
US
Email:
Phone: (617)933-8338
FAX: (617)977-9174
Website: http://www.mscba.org
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 72-13 - 00 )
MSCBA seeks written quotes for the replacement of existing exterior door(s) and hardware at Miles-DiNardo Hall. Door(s) will be replaced in order of campus priority and to the extent available funds allow. Scope of Work Statement is available on 7/10/2024 at 9 AM., a request must be submitted to receive the Scope of Work Statement by emailing Kiara Taylor @ ktaylor@mscba.org
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status