You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-21-1142-PFD01-PFD01-53235
Header Information
Bid Number:
BD-21-1142-PFD01-PFD01-53235
Description:
#7152 M.G.L. c. 149, sections 44A-44J , Woods Mullen Addition, Renovation and New Elevator Project
Bid Opening Date:
08/03/2020 12:00:00 PM
Purchaser:
BID COUNTER
Organization:
City of Boston
Department:
PFD01 - Public Facilities Department
Location:
PFD01 - Public Facilities Department
Fiscal Year:
21
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
07/13/2020 09:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
site viewing is scheduled for Thursday, July 23, 2020, from 10 a.m. to 11 a.m. at the Woods Mullen Shelter, 794 Massachusetts Avenue, Boston, MA 02118.
Bulletin Desc:
The scope of work is further detailed in the specifications and includes restoration of existing BPL McKim Building Courtyard pool, including removal and replacement of waterproof membrane, marble mosaic tile, fountain lighting, new electrical system, and new UV filtration system.
Ship-to Address:
Rita Gorman
2 Center Plaza, Suite 700
Boston, MA 02108
US
Email: bid.info@boston.gov
Phone: (617) 635-4809
Bill-to Address:
PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617) 635-4809
Print Format:
Bid Print
File Attachments:
Advertisement
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Item Information
1-5 of 24
1
2
3
4
5
Item # 1: ( 72-10 - 00 )
The scope of work is further detailed in the specifications and consists of demolition, renovation and new construction in an existing five-story commercial building to include a new three-story addition, new building entrance, new elevator, stairs, offices, lounge, dormitories/bedrooms, group toilets/shower rooms, exterior masonry cladding and new roof construction.
U N S P S C Code:
72-10-00
Building construction and support and maintenance and repair
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 72-15 - 00 )
The scope of work is further detailed in the specifications and consists of demolition, renovation and new construction in an existing five-story commercial building to include a new three-story addition, new building entrance, new elevator, stairs, offices, lounge, dormitories/bedrooms, group toilets/shower rooms, exterior masonry cladding and new roof construction.
U N S P S C Code:
72-15-00
Specialized trade construction and maintenance services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 72-10 - 25 )
The scope of work is further detailed in the specifications and consists of demolition, renovation and new construction in an existing five-story commercial building to include a new three-story addition, new building entrance, new elevator, stairs, offices, lounge, dormitories/bedrooms, group toilets/shower rooms, exterior masonry cladding and new roof construction.
U N S P S C Code:
72-10-25
Masonry and stonework and tile setting
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 4: ( 72-15 - 19 )
The scope of work is further detailed in the specifications and consists of demolition, renovation and new construction in an existing five-story commercial building to include a new three-story addition, new building entrance, new elevator, stairs, offices, lounge, dormitories/bedrooms, group toilets/shower rooms, exterior masonry cladding and new roof construction.
U N S P S C Code:
72-15-19
Masonry and stonework services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 5: ( 31-13 - 00 )
The scope of work is further detailed in the specifications and consists of demolition, renovation and new construction in an existing five-story commercial building to include a new three-story addition, new building entrance, new elevator, stairs, offices, lounge, dormitories/bedrooms, group toilets/shower rooms, exterior masonry cladding and new roof construction.
U N S P S C Code:
31-13-00
Forgings
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
1-5 of 24
1
2
3
4
5
Quote #
Description
Date Last Modified
Status