You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-21-1030-0T100-0T100-61547
Header Information
Bid Number:
BD-21-1030-0T100-0T100-61547
Description:
Rail-Replace existing bridge on the Middleboro Subdivision (MP 6.84) with new steel girders, pre-cas
Bid Opening Date:
05/20/2021 02:00:00 PM
Purchaser:
Monica Auguste
Organization:
Department of Transportation
Department:
0T100 - RAIL AND TRANSIT
Location:
0T100 - RAIL AND TRANSIT
Fiscal Year:
21
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
Yes
Alternate Id:
Railroad bridge replacement
Required Date:
04/20/2021
Available Date :
04/21/2021 01:00:00 PM
Info Contact:
Chalita Belfield e-mail chalita.belfield@dot.state.ma.us
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Mandatory pre-bid meeting & site tour: 04/27/21 @10:00 a.m. See bid documents for details and requirements.
Bulletin Desc:
All attendees accessing RR ROW must have the proper Personal Protection Equipment required by MCRR including reflective vest, hardhat, safety glasses and safety toed boots.
Ship-to Address:
RAIL AND TRANSIT
10 Park Plaza
Suite 4160
Boston, MA 02116
US
Email: noemail@noemail.com
Phone: (999)999-9999
Bill-to Address:
RAIL AND TRANSIT
10 Park Plaza
Suite 4160
Boston, MA 02116
US
Email: noemail@noemail.com
Phone: (999)999-9999
Print Format:
File Attachments:
01 - Notice to Bidders~13.pdf
A-MP_6-84_Specifications_1of2.pdf
B-MP_6-84_Specifications_2of2.pdf
C-MP_6-84_Plans.pdf
D-MP_6-84_Permitting Site Plans.pdf
E-MP_6-84_MassDOT Rail - NOI Norton 2021.03.26.pdf
F-MP_6-84_MassDOT Rail - NOI Taunton 2021.03.26.pdf
Addendum No 1 Pre Bid & Site Meeting.pdf
Addendum No 2 Pre Bid Attendees Sign in Sheet.pdf
MP 6-84 Add No 3 - Addendum No 3 Complete excluding NOI and End Species packages.pdf
MP 6-84 Add No 3 - FINAL NOI Permit Package Norton.pdf
MP 6-84 Add No 3 - FINAL NOI Permit Package Taunton.pdf
MP 6-84 Add No 3 - Natural Heritage Endangered Species Program - No Adverse Consultation.pdf
MP 6-84 Add No 3 - Responses to Contractors Questions_210511.pdf
Advisory Commbuys Bid Submission Only~1.pdf
Mp 6.84 bids received.jpg
Bid Results Rehab Bridge at MP 6.84 Middleboro Sub contractor bids.xlsx
MAS protest Middleboro Bridge at 6.84 Bid Comments.pdf
MassDOT Response to MAS (002).pdf
Bridge MP 6.84 Bid Summary _06-14-2021.pdf
Form Attachments:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
YES
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment #
Amendment Date
Amendment Note
1
04/22/2021 01:16:40 PM
Attachment File Changes: Header 1. File 'Addendum No 1 Pre Bid & Site Meeting.pdf': File 'Addendum No 1 Pre Bid & Site Meeting.pdf' added .
2
05/04/2021 01:55:10 PM
Attachment File Changes: Header 1. File 'Addendum No 2 Pre Bid Attendees Sign in Sheet.pdf': File 'Addendum No 2 Pre Bid Attendees Sign in Sheet.pdf' added .
3
05/10/2021 11:38:08 AM
Attachment File Changes: Header 1. File 'Rail-Replace existing bridge on the Middleboro Subdivision (MP 6.84) Q answers.xlsx': File 'Rail-Replace existing bridge on the Middleboro Subdivision (MP 6.84) Q answers.xlsx' added . 2. File 'Advisory Commbuys Bid Submission Only.pdf': File 'Advisory Commbuys Bid Submission Only.pdf' added .
4
05/10/2021 12:23:45 PM
Attachment File Changes: Header 1. File 'Rail-Replace existing bridge on the Middleboro Subdivision (MP 6.84) Q answers.xlsx': File 'Rail-Replace existing bridge on the Middleboro Subdivision (MP 6.84) Q answers.xlsx' deleted . 2. File 'Advisory Commbuys Bid Submission Only.pdf': File 'Advisory Commbuys Bid Submission Only.pdf' deleted .
5
05/11/2021 05:11:47 PM
Attachment File Changes: Header 1. File 'MP 6-84 Add No 3 - Addendum No 3 Complete excluding NOI and End Species packages.pdf': File 'MP 6-84 Add No 3 - Addendum No 3 Complete excluding NOI and End Species packages.pdf' added . 2. File 'MP 6-84 Add No 3 - FINAL NOI Permit Package Norton.pdf': File 'MP 6-84 Add No 3 - FINAL NOI Permit Package Norton.pdf' added . 3. File 'MP 6-84 Add No 3 - FINAL NOI Permit Package Taunton.pdf': File 'MP 6-84 Add No 3 - FINAL NOI Permit Package Taunton.pdf' added . 4. File 'MP 6-84 Add No 3 - Natural Heritage Endangered Species Program - No Adverse Consultation.pdf': File 'MP 6-84 Add No 3 - Natural Heritage Endangered Species Program - No Adverse Consultation.pdf' added . 5. File 'MP 6-84 Add No 3 - Responses to Contractors Questions_210511.pdf': File 'MP 6-84 Add No 3 - Responses to Contractors Questions_210511.pdf' added . 6. File 'Advisory Commbuys Bid Submission Only~1.pdf': File 'Advisory Commbuys Bid Submission Only~1.pdf' added .
6
05/20/2021 02:32:03 PM
Attachment File Changes: Header 1. File 'Mp 6.84 bids received.jpg': File 'Mp 6.84 bids received.jpg' added .
7
06/08/2021 10:39:25 AM
Attachment File Changes: Header 1. File 'Bid Results Rehab Bridge at MP 6.84 Middleboro Sub contractor bids.xlsx': File 'Bid Results Rehab Bridge at MP 6.84 Middleboro Sub contractor bids.xlsx' added .
8
06/17/2021 10:57:12 AM
Attachment File Changes: Header 1. File 'MAS protest Middleboro Bridge at 6.84 Bid Comments.pdf': File 'MAS protest Middleboro Bridge at 6.84 Bid Comments.pdf' added . 2. File 'MassDOT Response to MAS (002).pdf': File 'MassDOT Response to MAS (002).pdf' added .
9
06/17/2021 12:35:49 PM
Attachment File Changes: Header 1. File 'Bridge MP 6.84 Bid Summary _06-14-2021.pdf': File 'Bridge MP 6.84 Bid Summary _06-14-2021.pdf' added .
Item Information
Item # 1: ( 72-14-00-00-0000 )
Subdivision (MP 6.84) with new steel girders, pre-cast head and wing walls. The line is operated and maintained by Mass Coastal Railroad. Prospective bidders must be prequalified per MBTA Procedures Governing Classification Rating of Prospective Bidders. No award will be given to contractor not prequalified by MBTA in Class 1 General Transit Construction, Class 3 Trackwork or Class 4A Bridges: Steel Superstructures for a $6.5 million contract value. Contractor must show evidence of having worked on an active railroad and was able to complete the work with no impacts to railroad operations.
U N S P S C Code:
72-14-00
Heavy construction services
72-14-00-00
Heavy construction services
72-14-00-00-0000
Heavy construction services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 72-14-00-00 )
72-14-00-00 : Heavy construction services Subdivision (MP 6.84) with new steel girders, pre-cast head and wing walls. The line is operated and maintained by Mass Coastal Railroad. Prospective bidders must be prequalified per MBTA Procedures Governing Classification Rating of Prospective Bidders. No award will be given to contractor not prequalified by MBTA in Class 1 General Transit Construction, Class 3 Trackwork or Class 4A Bridges: Steel Superstructures for a $6.5 million contract value. Contractor must show evidence of having worked on an active railroad and was able to complete the work with no impacts to railroad operations.
U N S P S C Code:
72-14-00
Heavy construction services
72-14-00-00
Heavy construction services
72-14-00-00
Heavy construction services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status