You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-20-2080-FINA0-FIN02-98789
Header Information
Bid Number:
BD-20-2080-FINA0-FIN02-98789
Description:
RTU Replacement
Bid Opening Date:
03/29/2024 11:00:00 AM
Purchaser:
J Eric Boes
Organization:
Crest Collaborative
Department:
FINA01 - CB Finance
Location:
FIN02 - CB Procurement
Fiscal Year:
20
Type Code:
SS
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
03/29/2024
Available Date :
02/28/2024 12:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Bid walkthrough at 20 Shattuck Road in Andover, MA 01810 on Thursday, March 7, 2024 at 11:00 AM
Bulletin Desc:
CREST Collaborative, 20 Shattuck Rd, Andover, MA 01810, the Awarding Authority, invites sealed bids for the CREST Collaborative RTU Replacement Project located at 20 Shattuck RD, Andover, MA 01810. The work is estimated to cost $1,150,000. Construction Schedule anticipated to start late August 2024 and substantially completed by early September 2024 depending on RTU lead time. Bids are subject to M.G.L. c.149 44A-J & to minimum wage rates as required by M.G.L. c.149 26 to 27H inclusive.
Ship-to Address:
J. Eric Boes
1 Branch Street
Methuen, MA 01844
US
Email: jeboes@crestcollaborative.org
Phone: (978)685-3000
Bill-to Address:
J. Eric Boes
1 Branch Street
Methuen, MA 01844
US
Email: jeboes@crestcollaborative.org
Phone: (978)685-3000
Print Format:
Bid Print
File Attachments:
CREST Collaborative RTU Replacement Projet
Form Attachments:
Required Quote Attachments
Item Information
Item # 1: ( 72-15 - 12 )
CREST Collaborative, 20 Shattuck Rd, Andover, MA 01810, the Awarding Authority, invites sealed bids for the CREST Collaborative RTU Replacement Project located at 20 Shattuck RD, Andover, MA 01810. The work is estimated to cost $1,150,000. Construction Schedule anticipated to start late August 2024 and substantially completed by early September 2024 depending on RTU lead time. Bids are subject to M.G.L. c.149 44A-J & to minimum wage rates as required by M.G.L. c.149 26 to 27H inclusive.
U N S P S C Code:
72-15-12
Heating and cooling and air conditioning HVAC construction a
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status