Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-20-1537-HUBBD-DPW02-49129

Header Information

Bid Number: BD-20-1537-HUBBD-DPW02-49129 Description: materials Bid Opening Date: 04/08/2020 01:00:00 PM
Purchaser: Travis Brown Organization: Town of Hubbardston
Department: HUBBDPW - DPW Location: DPW02 - DPW Wor Road
Fiscal Year: 20 Type Code: NS Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  03/02/2020 07:00:00 AM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc: Highway Materials for FY2021 to include: Line Painting, Catch Basin Cleaning, MASS DOT approved 1 1/2" Hard Pack, 6" Minus Rip Rap, MASS DOT approved HMA, Super Cold Patch, MASS DOT approved Berm Mix
Ship-to Address: Travis Brown
68 Worcester Road
Hubbardston, MA 01452
US
Email: highway@hubbardstonma.us
Phone: (978) 928-1408
Bill-to Address: Travis Brown
68 Worcester Road
Hubbardston, MA 01452
US
Email: highway@hubbardstonma.us
Phone: (978) 928-1408
Print Format: Bid Print
File Attachments: Material Bid FY21
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description

Item Information

1-5 of 7
1  2 
Item # 1:   ( 11-11  -  00 )   MASS DOT approved inch and a half Hard Pack
U N S P S C Code: 11-11-00
   Earth and stone
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   TON - Ton    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 72-14  -  14 )   Cleaning of Catch Basins,Manholes and DI
U N S P S C Code: 72-14-14
   Detention facility construction and repair services
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   UNIT - Unit    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 72-15  -  00 )   Line Painting,Crosswalks, Railroad Crossings, Stop Lines, Parking Spaces, Handicap Parking Spaces, and School Slow, Stop , Stop Ahead
U N S P S C Code: 72-15-00
   Specialized trade construction and maintenance services
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LFT - Linear foot    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 11-11  -  16 )   6 inch Minus rip rap
U N S P S C Code: 11-11-16
   Stone
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   TON - Ton    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 30-12  -  16 )   MASS DOT approved HMA
U N S P S C Code: 30-12-16
   Asphalts
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   TON - Ton    
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 7
1  2 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status