Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-19-1206-40000-40000-36461

Header Information

Bid Number: BD-19-1206-40000-40000-36461 Description: RFP # 38F-19 Traction Power Sub Meter Pilot Project Bid Opening Date: 04/17/2019 02:00:00 PM
Purchaser: John de Lalla Organization: Massachusetts Bay Transportation Authority
Department: 400000 - Procurement & Logistics Location: 40000 - 400000 Procurement & Logistics
Fiscal Year: 19 Type Code: Allow Electronic Quote: Yes
Alternate Id:   Required Date: 04/17/2019 Available Date :  03/18/2019 05:00:00 PM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: Pre-Bid Conference call on 3/25/2019 11:00 AM 605-562-0400, Code 2295149, recommended attendance for site visits on 4/2/2019
Bulletin Desc: Response Due Date, Public Opening at MBTA Offices 10 Park Plaza Suite 2810, Boston MA 02116
Ship-to Address: MBTA
10 Park Plaza
Accounts Payable Department
Boston, MA 02116
US
Email: invoices@mbta.com
Phone: (617) 222-3235
Bill-to Address: MBTA
10 Park Plaza
Accounts Payable Department
Boston, MA 02116
US
Email: invoices@mbta.com
Phone: (617) 222-3235
Print Format: Bid Print
File Attachments: RFP Traction Power Submetering Pilot Project 3.18.2019~1.pdf
MBTA Minimum Insurance Requirements.pdf
Technical Specification _ Plans w cover Exhibit 10.2.pdf
Boston Prevailing Wage.pdf
Braintree Prevailing Wage.pdf
Addendum 1 Traction Power Sun Meter RFP .pdf
Pre-Bid Conference Call Notes -.pdf
Addendum 2 Traction Power Sub Meter RFP.pdf
MBTA Minimum Insurance Requirements- Revised.pdf
Addendum 3 Traction Power Sub Meter RFP.pdf
Addendum 4 Traction Power Sub Meter RFP.pdf
Addendum 5 Traction Power Sub Meter RFP .pdf
MBTA Communications Fiber Spec C-76 - Updated 2019.pdf
PLAN SET 20190501 FINAL.pdf
SECTION 01010 rev 6.pdf
TPSS_ESMS TOC_rev .pdf
Addendum 6 Traction Power Sub Meter RFP ~1.pdf
Addendum 7 Traction Power Sub Meter RFP .pdf
Notice of Award - Dagle Electrical Construction Corp. COMMBUYS.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 03/20/2019 04:11:52 PM Header 1. Pre-Bid Conference changed from "Pre-Bid Conference call on 3/25/2019 11:00 AM 605-562-0400, Code 2295149, recommended attendance for site visits on 4/2/2019" to "Pre-Bid Conference call on 3/25/2019 11:00 AM 605-562-0400, Code 2295149, recommended attendance for site visits on 4/2/2019". Attachment File Changes: Header 1. File 'Addendum 1 Traction Power Sun Meter RFP .pdf': File 'Addendum 1 Traction Power Sun Meter RFP .pdf' added . Enrollment Date Changes:
2 03/25/2019 11:47:59 AM Attachment File Changes: Header 1. File 'Pre-Bid Conference Call Notes -.pdf': File 'Pre-Bid Conference Call Notes -.pdf' added . Enrollment Date Changes:
3 03/26/2019 03:31:23 PM Attachment File Changes: Header 1. File 'Addendum 2 Traction Power Sub Meter RFP.pdf': File 'Addendum 2 Traction Power Sub Meter RFP.pdf' added . Addendum 2, NOTE: 3/20/2019 is Addendum 1, NOTE: 3/25/2019 is Pre-Bid Conference call notes 2. File 'MBTA Minimum Insurance Requirements- Revised.pdf': File 'MBTA Minimum Insurance Requirements- Revised.pdf' added . Insurance Revised Enrollment Date Changes:
4 04/10/2019 03:48:38 PM Attachment File Changes: Header 1. File 'Addendum 3 Traction Power Sub Meter RFP.pdf': File 'Addendum 3 Traction Power Sub Meter RFP.pdf' added . Enrollment Date Changes:
5 04/26/2019 02:26:40 PM Attachment File Changes: Header 1. File 'Addendum 4 Traction Power Sub Meter RFP.pdf': File 'Addendum 4 Traction Power Sub Meter RFP.pdf' added . New Response due date 05/22/2019 at 2:00 PM, Site visit 05/08/2019 Enrollment Date Changes:
6 05/01/2019 01:22:41 PM ADDENDUM 5 - Revised drawings/specifications Attachment File Changes: Header 1. File 'Addendum 5 Traction Power Sub Meter RFP .pdf': File 'Addendum 5 Traction Power Sub Meter RFP .pdf' added . 2. File 'MBTA Communications Fiber Spec C-76 - Updated 2019.pdf': File 'MBTA Communications Fiber Spec C-76 - Updated 2019.pdf' added . 3. File 'PLAN SET 20190501 FINAL.pdf': File 'PLAN SET 20190501 FINAL.pdf' added . 4. File 'SECTION 01010 rev 6.pdf': File 'SECTION 01010 rev 6.pdf' added . 5. File 'TPSS_ESMS TOC_rev .pdf': File 'TPSS_ESMS TOC_rev .pdf' added . Enrollment Date Changes:
7 05/06/2019 11:26:14 AM Addendum 6 - Site Visit confirmation time and Place. Attachment File Changes: Header 1. File 'Addendum 6 Traction Power Sub Meter RFP ~1.pdf': File 'Addendum 6 Traction Power Sub Meter RFP ~1.pdf' added . Enrollment Date Changes:
8 05/17/2019 08:25:57 AM Attachment File Changes: Header 1. File 'Addendum 7 Traction Power Sub Meter RFP .pdf': File 'Addendum 7 Traction Power Sub Meter RFP .pdf' added . Enrollment Date Changes:
9 06/04/2019 03:37:51 PM Attachment File Changes: Header 1. File 'Notice of Award - Dagle Electrical Construction Corp. COMMBUYS.pdf': File 'Notice of Award - Dagle Electrical Construction Corp. COMMBUYS.pdf' added . Enrollment Date Changes:

Item Information

Item # 1:   ( 72-15-15-09-0000 )   Traction Power Sub Meter Pilot Project RFP#38F-19
U N S P S C Code: 72-15-15
   Electrical system services
  72-15-15-09
    Energy management controls installation service
  72-15-15-09-0000
    Energy management controls installation service
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0      
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 41-11-36-00-0000 )   Traction Power Sub Meter Pilot Project RFP#38F-19
U N S P S C Code: 41-11-36
   Electrical measuring and testing equipment and accessories
  41-11-36-00
    Electrical measuring and testing equipment and accessories
  41-11-36-00-0000
    Electrical measuring and testing equipment and accessories
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0      
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status