You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-19-1030-0T100-0T281-36664
Header Information
Bid Number:
BD-19-1030-0T100-0T281-36664
Description:
Rail-Signal upgrades at 11 grade crossings, S.E. Mass Lines
Bid Opening Date:
03/27/2019 02:00:00 PM
Purchaser:
Monica Auguste
Organization:
Department of Transportation
Department:
0T100 - RAIL AND TRANSIT
Location:
0T281 - RAIL Departmental Contracts
Fiscal Year:
19
Type Code:
Allow Electronic Quote:
No
Alternate Id:
MCRR
Required Date:
Available Date :
03/12/2019 05:00:00 PM
Info Contact:
Rob Finley at 978-263-5565, e-mail rcfinley@verizon.net
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Mandatory pre-bid meeting and site tour: 3/14/19 @ 10:30 a.m. Meet at first floor conference room at CCRTA Hyannis Transportation Center, 215 Iyannough Rd., Hyannis.
Bulletin Desc:
All attendees accessing RR ROW must have the proper Personal Protection Equipment required by MCRR including reflective vest, hardhat, safety glasses and safety toed boots. RSVP to Rob Finley, MCRR, rcfinley@verizon.net.
Ship-to Address:
Chief Financial Office Unit
10 Park Plaza
Boston, MA 02116
US
Email: Noname@state.ma.us
Phone: (999)999-9999
Bill-to Address:
Chief Financial Office Unit
10 Park Plaza
Boston, MA 02116
US
Email: Noname@state.ma.us
Phone: (999)999-9999
Print Format:
File Attachments:
Notice to Bidders_SE Rail.pdf
Form Attachments:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
YES
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment #
Amendment Date
Amendment Note
1
03/12/2019 05:24:50 PM
Header 1. Bid Opening Date changed from "03/28/2019 02:00:00 PM" to "03/27/2019 02:00:00 PM". Enrollment Date Changes:
Item Information
1-5 of 10
1
2
Item # 1: ( 39-11-16-03-0000 )
Upgrade selected components of existing wayside Automatic Highway Crossing Warning systems at 11 grade crossings on the Cape Main Line, Falmouth Secondary and So. Dennis Secondary. Work includes replacing mast-mounted flashing lights and bells, all cables, storage batteries, rectifiers and miscellaneous equipment. Project includes demolition and disposal of existing signal equipment. Contractor must show evidence of having worked on an active railroad and was able to complete the work with no or few shutdowns and no impacts to Operations. Estimated cost is $1,100,000.
U N S P S C Code:
39-11-16
Exterior lighting and fixtures
39-11-16-03
Roadway or highway lighting
39-11-16-03-0000
Roadway or highway lighting
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 39-11-16-03 )
39-11-16-03 : Roadway or highway lighting
U N S P S C Code:
39-11-16-03
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
This item is narrative
Item # 3: ( 32-15-15-00-0000 )
Upgrade selected components of existing wayside Automatic Highway Crossing Warning systems at 11 grade crossings on the Cape Main Line, Falmouth Secondary and So. Dennis Secondary. Work includes replacing mast-mounted flashing lights and bells, all cables, storage batteries, rectifiers and miscellaneous equipment. Project includes demolition and disposal of existing signal equipment. Contractor must show evidence of having worked on an active railroad and was able to complete the work with no or few shutdowns and no impacts to Operations. Estimated cost is $1,100,000.
U N S P S C Code:
32-15-15
Control indicating and signaling devices
32-15-15-00
Control indicating and signaling devices
32-15-15-00-0000
Control indicating and signaling devices
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 4: ( 32-15-15-00 )
32-15-15-00 : Control indicating and signaling devices
U N S P S C Code:
32-15-15-00
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
This item is narrative
Item # 5: ( 72-14-10-02-0000 )
Upgrade selected components of existing wayside Automatic Highway Crossing Warning systems at 11 grade crossings on the Cape Main Line, Falmouth Secondary and So. Dennis Secondary. Work includes replacing mast-mounted flashing lights and bells, all cables, storage batteries, rectifiers and miscellaneous equipment. Project includes demolition and disposal of existing signal equipment. Contractor must show evidence of having worked on an active railroad and was able to complete the work with no or few shutdowns and no impacts to Operations. Estimated cost is $1,100,000.
U N S P S C Code:
72-14-10
Highway and road construction services
72-14-10-02
Highway and road sign or guardrail construction and repair s
72-14-10-02-0000
Highway and road sign or guardrail construction and repair s
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
Manufacturer:
Brand:
Model:
Make:
Packaging:
1-5 of 10
1
2
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status