Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-19-1019-DCP08-ENR01-29482

Header Information

Bid Number: BD-19-1019-DCP08-ENR01-29482 Description: MIL1901E-EC1 MIL-Natick-Solar PV-Design/Build Bid Opening Date: 09/12/2018 02:00:00 PM
Purchaser: Ryan Harold Organization: Division of Capital Asset Management and Maintenance
Department: DCP08 - Energy Group Location: ENR01 - Energy Group
Fiscal Year: 19 Type Code: Allow Electronic Quote: Yes
Alternate Id: MIL1901E EC1  Required Date: Available Date :  08/01/2018 09:44:59 AM
Info Contact: Ryan Harold ryan.harold@mass.gov 857-204-1449 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: August 7, 2018 at 10:00am at 149 Speen Street Natick. Please RSVP to ryan.harold@mass.gov before 5:00pm on August 6, 2018
Bulletin Desc: MIL1901E-EC1 Project Title MIL-Natick-Solar PV-Design/Build project to Design and Build a 205KW Solar PV Canopy and EV Charging Stations. Battery storage and rooftop solar are alternative ECMs.
Ship-to Address: DCAMM
1 Ashburton Place
Room 1607
Boston, MA 02108
US
Email: stephen.white@mass.gov
Phone: (857) 408-9092
Bill-to Address: DCAMM
1 Ashburton Place
Room 1607
Boston, MA 02108
US
Email: stephen.white@mass.gov
Phone: (857) 408-9092
Print Format:
File Attachments: MIL1901E Proposals Recieved.pdf
Environmental Baseline Study Draft June 4, 2010.pdf
Geotechnical Engineering Report 03-22-11.pdf
MIL1901E-EC1_Dec. of Soil Bearing Capacity.pdf
MAARNG Natick_C-101_Lyt Matls Pln_2015_As-Built_Mark-Up.pdf
MAARNG Natick_C-102_Lyt+Matls Pln_2015_As-Built_Mark-Up.pdf
MAARNG Natick_C-103_Grading+Drain Pln_2015_As-Built_Mark-Up.pdf
MAARNG Natick_C-104_Grading+Drain Pln_2015_As-Built_Mark-Up.pdf
MAARNG Natick_C-105_Utility Plan_2015_As-Built_Mark-Up.pdf
MAARNG Natick_C-106_Utility Plan_2015_As-Built.pdf
MAARNG Natick_E1.00_Elec Site Plan_2015_As-Built.pdf
MAARNG Natick_E1.00_Elec Site Pln_2015_As-Built_Mark-Up.pdf
MAARNG Natick_E1.01_Elec Site Detls_2015_As-Built.pdf
MAARNG Natick_E1.01_Elec Site Dets_2015_As-Built_Mark-Up.pdf
MAARNG Natick_LS-101_Landscape+Plant Pln_2015_As-Built.pdf
MIL1901E_Natick_Real_Property.pdf
MIL1901E_Prevailing_Wage.pdf
MIL1901E Eversource Elect Bills Nov 2015-July 2018.pdf
SDO-certified MWBE Sub-contractors~2.xlsx
017418-DBB-rev71-Demolition Waste Mgmt and Disposal~1.pdf
017419-DBB-rev71-Construction Waste Mgmt and Disposal~1.pdf
018100-DBB-rev71-Commissioning~1.pdf
024100-DBB-rev71-Demolition~1.pdf
260001-CMR-rev71-TB Electrical Work~1.pdf
MAARNG Natick_H2.04_HVAC Roof New Wrk Pln_2015_As-Built_Mark-Up.pdf
Natick Readiness Center Report-6.7.17.pdf
MAARNG Natick_Struct Sects+Detls_As-Built_Mark-Up.pdf
ESA Small Project Template August 2018.pdf
DOC011.pdf
preproposalsignin8.7.18.pdf
MIL1901E Pre-Proposal Conference PresentanKAL.pptx
site visit sign in sheet 8.9.18.pdf
MIL1901E Natick Solar PV RFP.pdf
MIL1901E EC1 Pricing Savings Form.xlsx
MIL1901E_EC1_ Response_Form.docx
MIL1901E Scope of Work Form_Final.xlsx
MIL1901E.audit_template_savings.xlsm
MIL1901E Cover Letter.docx
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
SBPP (Small Business Purchasing Program) Eligible?: NO
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment # Amendment Date Amendment Note
1 08/01/2018 09:46:22 AM Changed bid available date to NOW Header 1. Available Date changed from "08/01/2018 06:00:00 PM" to "08/01/2018 09:44:59 AM". Enrollment Date Changes:
2 08/07/2018 01:55:20 PM prepoposal sign in and powerpoint posted Attachment File Changes: Header 1. File 'DOC011.pdf': File 'DOC011.pdf' added . 2. File 'preproposalsignin8.7.18.pdf': File 'preproposalsignin8.7.18.pdf' added . 3. File 'MIL1901E Pre-Proposal Conference PresentanKAL.pptx': File 'MIL1901E Pre-Proposal Conference PresentanKAL.pptx' added . Enrollment Date Changes:
3 08/09/2018 02:48:07 PM Attachment File Changes: Header 1. File 'walk through 8.9.18.pdf': File 'walk through 8.9.18.pdf' added . Enrollment Date Changes:
4 08/09/2018 03:25:26 PM Attachment File Changes: Header 1. File 'walk through 8.9.18.pdf': File 'walk through 8.9.18.pdf' deleted . 2. File 'site visit sign in sheet 8.9.18.pdf': File 'site visit sign in sheet 8.9.18.pdf' added . Enrollment Date Changes:
5 09/13/2018 10:25:58 AM Proposals received 9.12.18 Attachment File Changes: Header 1. File 'MIL1901E Proposals Recieved.pdf': File 'MIL1901E Proposals Recieved.pdf' added . Enrollment Date Changes:

Item Information

Item # 1:   ( 72-13  -  00 )   MIL1901E-EC1 MIL-Natick-Solar PV-Design/Build project to Design and Build a 205KW Solar PV Canopy and EV Charging Stations.
U N S P S C Code: 72-13-00
   General building construction
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 26-13-15-07-0000 )   MIL1901E-EC1 Project Title MIL-Natick-Solar PV-Design/Build project to Design and Build a 205KW Solar PV Canopy and EV Charging Stations.
U N S P S C Code: 26-13-15
   Power plants
  26-13-15-07
    Solar power plants
  26-13-15-07-0000
    Solar power plants
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0      
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 26-13-15-07 )   26-13-15-07 : Solar power plants
U N S P S C Code: 26-13-15-07
Qty Unit Cost UOM Total Discount Amt. Total Cost
This item is narrative
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status