You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-18-1167-PUR02-PUR01-26015
Header Information
Bid Number:
BD-18-1167-PUR02-PUR01-26015
Description:
Bid No. 18-139; Warner School Underground Storage Tank Removal
Bid Opening Date:
05/01/2018 02:00:00 PM
Purchaser:
Colm Moylan
Organization:
City of Springfield
Department:
PUR02 - Procurement
Location:
PUR01 - Procurement Office
Fiscal Year:
18
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
04/16/2018 12:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
An optional Site Visit has been scheduled for 4/17/18 at 11:00 A.M, on-site at Warner School (493 Parker Street).
Bulletin Desc:
Underground Storage Tank Removal at Warner School. Generally, the work includes, but is not limited to; removal of existing Under Ground Storage Tank, excavation, site protection, and utilities protection. Contractor shall supply all labor, equipment, materials, temporary storage, facilities, tools, , and other appliances necessary for the work in this section and as required to properly complete the project in accordance with the contract documents and good construction practice.
Ship-to Address:
Lauren Stabilo
36 Court Street - Room 307
Springfield, MA 01103
US
Email: lstabilo@springfieldcityhall.com
Phone: (413) 787-6284
FAX: (413) 787-6295
Bill-to Address:
Lauren Stabilo
36 Court Street - Room 307
Springfield, MA 01103
US
Email: lstabilo@springfieldcityhall.com
Phone: (413) 787-6284
FAX: (413) 787-6295
Print Format:
Bid Print
File Attachments:
Legal Ad Bid No. 18-139.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Item Information
Item # 1: ( 20-14 - 29 )
Underground Storage Tank Removal at Warner School. Generally, the work includes, but is not limited to; removal of existing Under Ground Storage Tank, excavation, site protection, and utilities protection. Contractor shall supply all labor, equipment, materials, temporary storage, facilities, tools, , and other appliances necessary for the work in this section and as required to properly complete the project in accordance with the contract documents and good construction practice.
U N S P S C Code:
20-14-29
Storage vessels and tanks
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status