Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-18-1142-PFD01-PFD01-27752

Header Information

Bid Number: BD-18-1142-PFD01-PFD01-27752 Description: #7124 M.G.L. c.30, §39M Sumner Schoolyard Renovation Bid Opening Date: 06/07/2018 12:00:00 PM
Purchaser: BID COUNTER Organization: City of Boston
Department: PFD01 - Public Facilities Department Location: PFD01 - Public Facilities Department
Fiscal Year: 18 Type Code: NS - Non-Statewide Solicitation Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  05/29/2018 09:00:00 AM
Info Contact: bid.info@boston.gov Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc: SCOPE OF WORK includes: Renovate the schoolyard by expanding the play area, adding new play equipment, new play surfaces and accessible pathways.
Ship-to Address: PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617) 635-4809
Bill-to Address: PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617) 635-4809
Print Format: Bid Print
File Attachments: Advertisement
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 72-14  -  00 )   All bids for this project are subject to current provisions of Massachusetts General Laws Chapter 30, section 39M as amended; and to the terms and provisions of the contract documents entitled Sumner Schoolyard Renovation project. SCOPE OF WORK includes: Renovate the schoolyard by expanding the play area, adding new play equipment, new play surfaces and accessible pathways.
U N S P S C Code: 72-14-00
   Heavy construction services
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 49-24  -  00 )   All bids for this project are subject to current provisions of Massachusetts General Laws Chapter 30, section 39M as amended; and to the terms and provisions of the contract documents entitled Sumner Schoolyard Renovation project. SCOPE OF WORK includes: Renovate the schoolyard by expanding the play area, adding new play equipment, new play surfaces and accessible pathways.
U N S P S C Code: 49-24-00
   Recreation and playground and swimming and spa equipment and
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 49-24  -  15 )   All bids for this project are subject to current provisions of Massachusetts General Laws Chapter 30, section 39M as amended; and to the terms and provisions of the contract documents entitled Sumner Schoolyard Renovation project. SCOPE OF WORK includes: Renovate the schoolyard by expanding the play area, adding new play equipment, new play surfaces and accessible pathways.
U N S P S C Code: 49-24-15
   Playground equipment
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 30-11  -  17 )   All bids for this project are subject to current provisions of Massachusetts General Laws Chapter 30, section 39M as amended; and to the terms and provisions of the contract documents entitled Sumner Schoolyard Renovation project. SCOPE OF WORK includes: Renovate the schoolyard by expanding the play area, adding new play equipment, new play surfaces and accessible pathways.
U N S P S C Code: 30-11-17
   Plasters
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status