Bid Solicitation: BD-18-1030-0P100-0P070-26283
Header Information
Bid Number: BD-18-1030-0P100-0P070-26283 Description: Replace railroad bridge superstructure over Cohasset Narrows in Wareham and Bourne Bid Opening Date: 05/23/2018 02:00:00 PM
Purchaser: Monica Auguste Organization: Department of Transportation
Department: 0T100 - RAIL AND TRANSIT Location: 0T281 - RAIL Departmental Contracts
Fiscal Year: 18 Type Code: Allow Electronic Quote: No
Alternate Id:   Required Date: 04/20/2018 Available Date :  04/20/2018 03:00:00 PM
Info Contact: Chalita Belfield, chalita.belfield@dot.state.ma.us Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: Mandatory pre-bid meeting & site tour: 4/26/18 @ 10:30 a.m. Meet at Bourne Fire Dept. HQ, 51 Meetinghouse Lane, Sagamore Beach, Bourne MA.
Bulletin Desc: Please read the Notice to Bidders: the bid docs will be available on 4/24/2018 at 2PM. But, the IFB plans are available for download.
Ship-to Address: RAIL AND TRANSIT
10 Park Plaza
Suite 4160
Boston, MA 02116
US
Email: noemail@noemail.com
Phone: (999)999-9999
Bill-to Address: RAIL AND TRANSIT
10 Park Plaza
Suite 4160
Boston, MA 02116
US
Email: noemail@noemail.com
Phone: (999)999-9999
Print Format:
File Attachments: Addendum 4 FY2018-2019 Cape Main BR_(MP54-31) Bid Extension.pdf
MassDOT Cape Main MP 54-31 Cohasset Narrows Bridge Replacement Bid Comparisons - 180531.pdf
MassDOT_Notice New Avaiability of Bid Docs_Cohasset Narrows.docx
MassDOT Rail-Cohasset Narrows bridge_04 20 18.docx
Cohasset Narrows Bid Docs Specifications.pdf
04 - Pre-Bid Attendees C.Narrows_04-26-18.pdf
FY2018-2019 Cape Main BR_(MP54-31)_Bid Docs Addendum No 1_~1.pdf
FY2018-2019 Cape Main BR_(MP54-31)_IFB_Plans~2.pdf
Addendum 2 FY2018-2019 Cape Main BR_(MP54-31)~1.pdf
Addendum 3 FY2018-2019 Cape Main BR_(MP54-31)~1.pdf
Form Attachments:
SBPP (Small Business Purchasing Program) Eligible?: NO
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment # Amendment Date Amendment Note
1 04/24/2018 04:56:00 PM bid document uploaded Attachment File Changes: Header 1. File 'Cohasset Narrows Bid Docs Specifications.pdf': File 'Cohasset Narrows Bid Docs Specifications.pdf' added . 2. File 'Cohasset Narrows Bid Docs Specifications~1.pdf': File 'Cohasset Narrows Bid Docs Specifications~1.pdf' added . Enrollment Date Changes:
2 04/26/2018 12:53:05 PM Addendum I uploaded Attachment File Changes: Header 1. File 'Cohasset Narrows Bid Docs Specifications~1.pdf': File 'Cohasset Narrows Bid Docs Specifications~1.pdf' deleted . 2. File 'FY2018-2019 Cape Main BR_(MP54-31)_Bid Docs Addendum No 1_.pdf': File 'FY2018-2019 Cape Main BR_(MP54-31)_Bid Docs Addendum No 1_.pdf' added . Enrollment Date Changes:
3 05/01/2018 09:11:07 AM Cohasset Narrows pre-bid meeting sign-in sheet Attachment File Changes: Header 1. File '04 - Pre-Bid Attendees C.Narrows_04-26-18.pdf': File '04 - Pre-Bid Attendees C.Narrows_04-26-18.pdf' added . Enrollment Date Changes:
4 05/01/2018 09:55:17 AM Attachment File Changes: Header 1. File 'FY2018-2019 Midd Sub MP 14-42 IFB Appendices.pdf': File 'FY2018-2019 Midd Sub MP 14-42 IFB Appendices.pdf' added . 2. File '01 - Notice to Bidders - MassDOT.pdf': File '01 - Notice to Bidders - MassDOT.pdf' added . 3. File 'FY2018-2019 Midd Sub MP 14-42 IFB Specs.pdf': File 'FY2018-2019 Midd Sub MP 14-42 IFB Specs.pdf' added . Enrollment Date Changes:
5 05/01/2018 11:34:01 AM Attachment File Changes: Header 1. File 'FY2018-2019 Cape Main BR_(MP54-31)_IFB_Plans.pdf': File 'FY2018-2019 Cape Main BR_(MP54-31)_IFB_Plans.pdf' deleted . 2. File 'FY2018-2019 Cape Main BR_(MP54-31)_Bid Docs Addendum No 1_.pdf': File 'FY2018-2019 Cape Main BR_(MP54-31)_Bid Docs Addendum No 1_.pdf' deleted . 3. File '01 - Notice to Bidders - MassDOT.pdf': File '01 - Notice to Bidders - MassDOT.pdf' deleted . Enrollment Date Changes:
6 05/01/2018 11:46:07 AM Attachment File Changes: Header 1. File 'FY2018-2019 Midd Sub MP 14-42 IFB Appendices.pdf': File 'FY2018-2019 Midd Sub MP 14-42 IFB Appendices.pdf' deleted . 2. File 'FY2018-2019 Midd Sub MP 14-42 IFB Specs.pdf': File 'FY2018-2019 Midd Sub MP 14-42 IFB Specs.pdf' deleted . 3. File 'FY2018-2019 Cape Main BR_(MP54-31)_Bid Docs Addendum No 1_~1.pdf': File 'FY2018-2019 Cape Main BR_(MP54-31)_Bid Docs Addendum No 1_~1.pdf' added . 4. File 'FY2018-2019 Cape Main BR_(MP54-31)_IFB_Plans~2.pdf': File 'FY2018-2019 Cape Main BR_(MP54-31)_IFB_Plans~2.pdf' added . Enrollment Date Changes:
7 05/01/2018 11:52:43 AM There only 1 Addendum for this project currently- A couple files were uploaded incorrectly and have seen been removed (6 files so far)- Sorry for the confusion Enrollment Date Changes:
8 05/14/2018 09:56:44 AM Attachment File Changes: Header 1. File 'Addendum 2 FY2018-2019 Cape Main BR_(MP54-31)~1.pdf': File 'Addendum 2 FY2018-2019 Cape Main BR_(MP54-31)~1.pdf' added . 2. File 'Addendum 3 FY2018-2019 Cape Main BR_(MP54-31)~1.pdf': File 'Addendum 3 FY2018-2019 Cape Main BR_(MP54-31)~1.pdf' added . Enrollment Date Changes:
9 05/15/2018 02:33:11 PM Header 1. Bid Opening Date changed from "05/17/2018 02:00:00 PM" to "05/23/2018 02:00:00 PM". 2. Pre-Bid Conference changed from "Mandatory pre-bid meeting & site tour: 4/26/18 @ 10:30 a.m. Meet at Bourne Fire Dept. HQ, 51 Meetinghouse Lane, Sagamore Beach, (Bourne) MA." to "Mandatory pre-bid meeting & site tour: 4/26/18 @ 10:30 a.m. Meet at Bourne Fire Dept. HQ, 51 Meetinghouse Lane, Sagamore Beach, Bourne MA.". Attachment File Changes: Header 1. File 'Addendum 4 FY2018-2019 Cape Main BR_(MP54-31) Bid Extension.pdf': File 'Addendum 4 FY2018-2019 Cape Main BR_(MP54-31) Bid Extension.pdf' added . Enrollment Date Changes:
10 05/15/2018 02:34:10 PM Addendum No 4 provides for a bid deadline extension (to 5/23/2018) and eliminates a requirement for the main line track spans to be replaced by 11/23/2018 Enrollment Date Changes:
11 06/01/2018 04:01:05 PM Cohasset Narrows Bridge Replacement Bid Comparison Attachment File Changes: Header 1. File 'MassDOT Cape Main MP 54-31 Cohasset Narrows Bridge Replacement Bid Comparisons - 180531.pdf': File 'MassDOT Cape Main MP 54-31 Cohasset Narrows Bridge Replacement Bid Comparisons - 180531.pdf' added . Enrollment Date Changes:
Item Information
Item # 1:   ( 72-14-11-07-0000 )   On the Cape Main Line at MP 54.31, remove existing 2-track, 5-span railroad bridge superstructure over the Cohasset Narrows (Wareham/Bourne). Modify existing substructures and replace superstructure with new welded plate deck girder spans with open timber deck and walkways
U N S P S C Code: 72-14-11
   Infrastructure building and surfacing and paving services
  72-14-11-07
    Bridge construction and repair service
  72-14-11-07-0000
    Bridge construction and repair service
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0          
Manufacturer: Brand: Model:
Make: Packaging:
 
    Bill-to Address: Chief Financial Office Unit
10 Park Plaza
Boston, MA 02116
Email: Noname@state.ma.us
Phone: (999)999-9999
 
MA-PAS4