Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-17-1940-HA116-HA116-69911

Header Information

Bid Number: BD-17-1940-HA116-HA116-69911 Description: Installation of exhaust fans, associated ductwork and roof caps, and GFCI outlets in thirty (30) apt Bid Opening Date: 01/27/2022 02:00:00 PM
Purchaser: Hugh Mackay Organization: Great Barrington Housing Authority
Department: HA116 - Great Barrington Housing Authority Location: HA116 - Great Barrington Housing Authority
Fiscal Year: 17 Type Code: SS Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  01/12/2022 08:00:00 AM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A pre-bid is scheduled for Thursday, January 20th at 10:00 AM, at 909 S Main Street, Great Barrington, MA 01230. Contractors meet outside Building 1. Contact Hugh Mackay at RCAT mackay@worcesterha.org with questions. Masks required on property
Bulletin Desc: The Project consists of: Installation of exhaust fans, associated ductwork and roof caps, and GFCI outlets in thirty (30) apartment unit bathrooms. THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED. at www.biddocsonline.com Please review the instructions in the bid documents on how to register as an electronic bidder. BIDDERS DO NOT QUOTE VIA COMMBUYS
Ship-to Address: Robert Penagos
630 Plantation Street
Worcester, MA 01605
US
Email: penagos@worcesterha.org
Phone: (978) 990-0139
Bill-to Address: Robert Penagos
630 Plantation Street
Worcester, MA 01605
US
Email: penagos@worcesterha.org
Phone: (978) 990-0139
Print Format: Bid Print
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 72-13  -  00 )   The Great Barrington Housing Authority, the Awarding Authority, invites sealed bids from Mechanical Contractors for the 667-1 Exhaust Fans, #116066 project in Great Barrington, Massachusetts, in accordance with the documents prepared by Hesnor Engineering Associates, PLLC and all incidental work necessary to complete the project. The Project consists of: Installation of exhaust fans, associated ductwork and roof caps, and GFCI outlets in thirty (30) apartment unit bathrooms.
U N S P S C Code: 72-13-00
   General building construction
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status