Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-17-1895-HGE00-HGE01-26231

Header Information

Bid Number: BD-17-1895-HGE00-HGE01-26231 Description: Contract #18-09 - No. 2 Overflow Drain Gate Replacement Bid Opening Date: 05/14/2018 11:00:00 AM
Purchaser: Tanya E. Roman Organization: Holyoke Gas & Electric
Department: HGE001 - Holyoke Gas & Electric Location: HGE01 - Holyoke Gas & Electric
Fiscal Year: 17 Type Code: NS Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  04/19/2018 02:24:42 PM
Info Contact: Yocelyn F. Delgado, Purchasing Coordinator (Email: ydelgado@hged.com) Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A mandatory pre-bid meeting is scheduled for May 2, 2018 at 10:00 a.m. at 28 Gatehouse Road, Holyoke, MA.
Bulletin Desc: No. 2 Overflow Drain Gate Replacement - work includes fabrication and installation of two (2) new 48"x48" drain gates, operators and platform for No. 2 Overflow via removal of the existing gates and operators and installation of new gates, operators and support structures.
Ship-to Address: Chi Wong
99 Suffolk Street
Holyoke, MA 01040
US
Email: cwong@hged.com
Phone: (413) 536-9308
FAX: (413) 552-9315
Bill-to Address: Chi Wong
99 Suffolk Street
Holyoke, MA 01040
US
Email: cwong@hged.com
Phone: (413) 536-9308
FAX: (413) 552-9315
Print Format: Bid Print
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 31-33  -  00 )   The invitation for bid (IFB) and contract are subject to MGL c.30 s.39M. A mandatory pre-bid meeting is scheduled to begin promptly at 10:00 a.m. on Wednesday, May 2, 2018 at 28 Gatehouse Road, Holyoke, MA. All Bidders are required to submit a bid deposit equal to 5% of the total value of their bid. Prevailing wage rates apply. The successful bidder will be required to furnish payment and performance bonds each equal to 100% of the total contract value.
U N S P S C Code: 31-33-00
   Fabricated structural assemblies
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status