You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-17-1818-HA283-HA283-112708
Header Information
Bid Number:
BD-17-1818-HA283-HA283-112708
Description:
Renovation of existing bathrooms to include new ADA shower, toilet, and sink.
Bid Opening Date:
03/12/2025 12:00:00 PM
Purchaser:
Hugh Mackay
Organization:
Stockbridge Housing Authority
Department:
HA283 - Stockbridge Housing Authority
Location:
HA283 - Stockbridge Housing Authority
Fiscal Year:
17
Type Code:
SS
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
02/19/2025 09:00:00 AM
Info Contact:
mackay@worcesterha.org
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
PRE-BID CONFERENCE / SITE VISIT: Scheduled Date and Time: 02/25/2025 at 11:00AM EST Address: 7 Pine Street, Stockbridge, MA 01262 Instructions: Meet at the project address. Parking on the road.
Bulletin Desc:
The Project consists of but not limited to: Renovation of existing bathrooms to include new ADA shower, toilet, and sink. New floor, wall, and ceiling finishes with minor electrical, exhaust fan, and toilet accessories. The project documents will be available for review at biddocs.com (may be viewed and downloaded electronically at no cost). or contact at 978-568-1167 BIDDEERS DO NOT QUOTE VIA COMMBUYS
Ship-to Address:
Robert Penagos
630 Plantation Street
Worcester, MA 01605
US
Email: penagos@worcesterha.org
Phone: (978) 990-0139
Bill-to Address:
Robert Penagos
630 Plantation Street
Worcester, MA 01605
US
Email: penagos@worcesterha.org
Phone: (978) 990-0139
Print Format:
Bid Print
Required Quote Attachments
Desired Attachment Name
Description
Item Information
Item # 1: ( 72-13 - 00 )
The Project consists of but not limited to: Renovation of existing bathrooms to include new ADA shower, toilet, and sink. New floor, wall, and ceiling finishes with minor electrical, exhaust fan, and toilet accessories. The work is estimated to cost $99,074.00.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status