| Bid Number: |
BD-17-1025-DOCFS-9818-12336
|
Description: |
DRM 2014-05 Cathodic Protection of Two Water Storage Tanks
|
Bid Opening Date: |
02/15/2017 02:00:00 PM
|
| Purchaser: |
Collette Blais
|
Organization: |
Department of Correction
|
| Department: |
DOCCF - DOC Fiscal Services
|
Location: |
9206H - 9206H Power Plant Bridgewater
|
| Fiscal Year: |
17
|
Type Code: |
|
Allow Electronic Quote: |
No
|
| Alternate Id: |
|
Required Date: |
|
Available Date
:
|
01/19/2017 11:20:03 AM |
| Info Contact: |
|
Bid Type: |
OPEN
|
Informal Bid Flag: |
No
|
| Purchase Method: |
Open Market
|
| Pre Bid Conference: |
To be held at the Power Plant, Old Colony Correctional Center, 12A Titicut Street, Bridgewater on Wednesday, 2/8/17 at 10:00 a.m. Bid intent forms due by 2/3/17.
|
| Bulletin Desc: |
Design and installation of complete ice-free, impressed current cathodic protection systems for two water storage tanks. The design shall be done by a corrosion specialist.
|
|
| Ship-to Address: |
DOC - Bridgewater Correctional Complex Power Plant 12A Titicut Street Bridgewater, MA 02324 US Email: Milfordap@state.ma.us Phone: (508) 000-0000
|
Bill-to Address: |
DOC - Fiscal Services Milford 50 Maple Street, Suite 3 Milford, MA 01757 US Email: milfordap@state.ma.us Phone: (508) 422-3300
|
Print Format: |
|
|
File Attachments:
|
Contract Award
Chapter 30 Bidding Package DRM2014-05.docx
Specifications.pdf
Drawings.pdf
Prevailing Wage.pdf
Addendum No. 1
Bid Results
|
|
Form Attachments:
|
|
| Desired Attachment Name |
Description |
|
|
|
SBPP (Small Business Purchasing Program) Eligible?:
|
NO
|
|
See SBPP requirements and exceptions at www.mass.gov/sbpp :
|
|
|
Amendments:
|
| Amendment # |
Amendment Date |
Amendment Note |
|
1
|
02/08/2017 03:22:24 PM
|
Attachment File Changes: Header 1. File 'Addendum No. 1': File 'Addendum No. 1' added . Enrollment Date Changes:
|
|
2
|
02/16/2017 11:35:21 AM
|
Attachment File Changes: Header 1. File 'Bid Results': File 'Bid Results' added . Enrollment Date Changes:
|
|
3
|
03/30/2017 12:37:35 PM
|
Attachment File Changes: Header 1. File 'Contract Award': File 'Contract Award' added . Enrollment Date Changes:
|
|