You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-17-1019-DCP08-ENR01-11413
Header Information
Bid Number:
BD-17-1019-DCP08-ENR01-11413
Description:
DMH0902 EC1 DMH Taunton State Hospital Design Build Energy Project
Bid Opening Date:
02/21/2017 02:00:00 PM
Purchaser:
Heidi J. Green
Organization:
Division of Capital Asset Management and Maintenance
Department:
DCP08 - Energy Group
Location:
ENR01 - Energy Group
Fiscal Year:
17
Type Code:
Allow Electronic Quote:
No
Alternate Id:
DMH0902 EC1
Required Date:
Available Date :
12/09/2016 04:00:00 PM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
December 19, 2016 at 10:00 a.m. at Taunton State Hospital. RSVP by December 15, 2016 at 3:00 p.m. to heidi.j.green@state.ma.us
Bulletin Desc:
DMH0902 EC1 DMH Taunton State Hospital Design Build Energy Project. ECMs include exterior and interior lighting, lighting controls, EMS, base mechanical upgrades, kitchen hood controls, water conservation measures, steam trap service, fan VFDs and related controls, pipe insulation, vending misers, building weatherization, boiler combustion controls, rooftop units replacement, power factor correction and general building code upgrades, among others.
Ship-to Address:
DCAMM
1 Ashburton Place
Room 1607
Boston, MA 02108
US
Email: edward.ransom@state.ma.us
Phone: (857)204-1487
Bill-to Address:
DCAMM
1 Ashburton Place
Room 1607
Boston, MA 02108
US
Email: edward.ransom@state.ma.us
Phone: (857)204-1487
Print Format:
File Attachments:
Requests_for_Proposals_DMH0902EC1
Cover_Letter_DMH0902EC1
Form_E_DMH0902EC1
Form_F_DMH0902EC1
FormsBCD_DMH0902EC1
Schematic_Design__DMH0902EC1
Performance_Specification_DMH0902EC1
Goss_Building_Audit_Template_DMH0902EC1
All_Other_Buildings_Audit_Template_DMH0902EC1
Condition_Assessment_DMH0902EC1
Asbestos_Containing_Building_Survey_DMH0902EC1
Asbestos_Containing_Materials_OperationsMaintenance_Program_DMH0902EC1
SDO_Certified_MWBE_Subcontractors.xls
Energy_Services_Agreement_DMH0902EC1
Prevailing_Wages_DMH0902EC1
Pre-Proposal Conference Presentation
Pre-Proposal Sign In Sheet
Sign-In Sheet Walk Through 12-20-2016
Pre-Proposal Meeting Minutes 12-19-2016
Taunton SH_Cain_M-1_Title Sh-HVAC_19920327_Contract
Taunton SH_Cain_M-2_Bsmt Flr Pln-HVAC_19920327_Contract
Taunton SH_Cain_M-3_1st Flr Pln-HVAC_19920327_Contract
Taunton SH_Cain_M-4_1st Flr Enlarged Pln-HVAC_19920327_Contract
Taunton SH_Cain_M-5_2nd Flr Pln-HVAC_19920327_Contract
Taunton SH_Cain_M-6_2nd Flr Enlarged Plns-HVAC_19920327_Contract
Taunton SH_Cain_M-7_3rd Flr Pln-HVAC_19920327_Contract
Taunton SH_Cain_M-8_3rd Flr Enlarged Plns-HVAC_19920327_Contract
Taunton SH_Cain_M-9_4th Flr Pln-HVAC_19920327_Contract
Taunton SH_Cain_M-10_4th Flr Enlarged Plns-HVAC_19920327_Contract
Taunton SH_Cain_M-11_Attic Flr Pln-HVAC_19920327_Contract
Taunton SH_Cain_M-12_Enlarged Mech Rm Plns-HVAC_19920327_Contract
Taunton SH_Cain_M-13_Flow Dgms-HVAC_19920327_Contract
Taunton SH_Cain_M-14_Dtls+Risers-HVAC_19920327_Contract
Taunton SH_Cain_M-15_Shdls+Dtls-HVAC_19920327_Contract
Taunton SH_Cain_M-16_Shdls-HVAC_19920327_Contract
Taunton SH_Chambers Complex_H-2_Site Plan_19911115
Taunton SH_Chambrs Addtn_H-11_Bsmnt Flr Pln_19911115
Taunton SH_Chambrs Addtn_H-12_1st Flr Pln_19911115
Taunton SH_Chambrs Addtn_H-13_Mech Rms+Flow Diag_19911115
Taunton SH_Chambrs Addtn_H-14_Scheds+Detls_19911115
Addendum No. 1
MHC Determination 12-7-2016
Sign-In Sheet Walk Through 1-11-2017
Sign-In Sheet Walk Through 1-12-2017.pdf
Addendum No. 2
Sign-In Sheet Walk Through 1-19-2017~1.pdf
0902-M-FP-007 REV-1-20-17.pdf
0902-M-SH-013 REV-1-20-17.pdf
0902-M-SH-014 REV 1-20-17 (2).pdf
0902-P-SH-022 REV-1-20-17.pdf
0902-E-LP-029 REV 1-20-17.pdf
0902-E-SH-032 REV-1-20-17.pdf
0902-E-DT-033 REV 1-20-17.pdf
Columbia Gas Layout Sheet.pdf
Taunton State Hospital Site Plan.pdf
Columbia Gas Excavation for Natural Gas Mains and Services.pdf
Meter Placement Guide.pdf
Energy Analysis - Besse.xls
Energy Analysis - Cain.xls
Energy Analysis - Chambers- aka Glass.xls
Energy Analysis - Cottage No. 5 6 8.xls
Energy Analysis - Glass House.xls
Energy Analysis - Goss.xls
Energy Analysis - Learoyd.xls
Energy Analysis - Lighting and Water Calcs.xlsx
Energy Analysis - Summary Table.xlsm
Energy Analysis - Sylvia Rec Center.xls
Energy Analysis -Power Plant.xls
TSH Utility Spreadsheet.xls
Addendum No. 3.pdf
FormsBCD_DMH0902EC1_Revision1.xlsx
Performance_Specification_DMH0902EC1 REV Jan 2017.pdf
Form_E_DMH0902EC1 Revision1.xlsx
DMH0902_ProposalOpening_2_21_17.pdf
DMH0902_EC1_ENE_AwardLetter_11_17.pdf
Form Attachments:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
NO
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment #
Amendment Date
Amendment Note
1
12/19/2016 02:06:15 PM
Attachment File Changes: Header 1. File 'Pre-Proposal Conference Presentation': File 'Pre-Proposal Conference Presentation' added .
2
12/19/2016 02:19:27 PM
Attachment File Changes: Header 1. File 'Pre-Proposal Sign In Sheet': File 'Pre-Proposal Sign In Sheet' added .
3
12/21/2016 03:48:36 PM
Attachment File Changes: Header 1. File 'Sign-In Sheet Walk Through 12-20-2016': File 'Sign-In Sheet Walk Through 12-20-2016' added .
4
12/29/2016 09:19:19 AM
Attachment File Changes: Header 1. File 'Pre-Proposal Meeting Minutes 12-19-2016': File 'Pre-Proposal Meeting Minutes 12-19-2016' added .
5
12/29/2016 02:00:29 PM
Attachment File Changes: Header 1. File 'Taunton SH_Cain_M-1_Title Sh-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-1_Title Sh-HVAC_19920327_Contract' added . 2. File 'Taunton SH_Cain_M-2_Bsmt Flr Pln-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-2_Bsmt Flr Pln-HVAC_19920327_Contract' added . 3. File 'Taunton SH_Cain_M-3_1st Flr Pln-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-3_1st Flr Pln-HVAC_19920327_Contract' added . 4. File 'Taunton SH_Cain_M-4_1st Flr Enlarged Pln-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-4_1st Flr Enlarged Pln-HVAC_19920327_Contract' added . 5. File 'Taunton SH_Cain_M-5_2nd Flr Pln-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-5_2nd Flr Pln-HVAC_19920327_Contract' added . 6. File 'Taunton SH_Cain_M-6_2nd Flr Enlarged Plns-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-6_2nd Flr Enlarged Plns-HVAC_19920327_Contract' added . 7. File 'Taunton SH_Cain_M-7_3rd Flr Pln-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-7_3rd Flr Pln-HVAC_19920327_Contract' added . 8. File 'Taunton SH_Cain_M-8_3rd Flr Enlarged Plns-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-8_3rd Flr Enlarged Plns-HVAC_19920327_Contract' added . 9. File 'Taunton SH_Cain_M-9_4th Flr Pln-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-9_4th Flr Pln-HVAC_19920327_Contract' added . 10. File 'Taunton SH_Cain_M-10_4th Flr Enlarged Plns-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-10_4th Flr Enlarged Plns-HVAC_19920327_Contract' added . 11. File 'Taunton SH_Cain_M-11_Attic Flr Pln-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-11_Attic Flr Pln-HVAC_19920327_Contract' added . 12. File 'Taunton SH_Cain_M-12_Enlarged Mech Rm Plns-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-12_Enlarged Mech Rm Plns-HVAC_19920327_Contract' added . 13. File 'Taunton SH_Cain_M-13_Flow Dgms-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-13_Flow Dgms-HVAC_19920327_Contract' added . 14. File 'Taunton SH_Cain_M-14_Dtls+Risers-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-14_Dtls+Risers-HVAC_19920327_Contract' added . 15. File 'Taunton SH_Cain_M-15_Shdls+Dtls-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-15_Shdls+Dtls-HVAC_19920327_Contract' added . 16. File 'Taunton SH_Cain_M-16_Shdls-HVAC_19920327_Contract': File 'Taunton SH_Cain_M-16_Shdls-HVAC_19920327_Contract' added . 17. File 'Taunton SH_Chambers Complex_H-2_Site Plan_19911115': File 'Taunton SH_Chambers Complex_H-2_Site Plan_19911115' added . 18. File 'Taunton SH_Chambrs Addtn_H-11_Bsmnt Flr Pln_19911115': File 'Taunton SH_Chambrs Addtn_H-11_Bsmnt Flr Pln_19911115' added . 19. File 'Taunton SH_Chambrs Addtn_H-12_1st Flr Pln_19911115': File 'Taunton SH_Chambrs Addtn_H-12_1st Flr Pln_19911115' added . 20. File 'Taunton SH_Chambrs Addtn_H-13_Mech Rms+Flow Diag_19911115': File 'Taunton SH_Chambrs Addtn_H-13_Mech Rms+Flow Diag_19911115' added . 21. File 'Taunton SH_Chambrs Addtn_H-14_Scheds+Detls_19911115': File 'Taunton SH_Chambrs Addtn_H-14_Scheds+Detls_19911115' added .
6
12/29/2016 02:56:33 PM
Attachment File Changes: Header 1. File 'Addendum No. 1': File 'Addendum No. 1' added . 2. File 'MHC Determination 12-7-2016': File 'MHC Determination 12-7-2016' added .
7
01/11/2017 02:06:28 PM
Attachment File Changes: Header 1. File 'Sign-In Sheet Walk Through 1-11-2017': File 'Sign-In Sheet Walk Through 1-11-2017' added . Enrollment Date Changes:
8
01/13/2017 02:32:16 PM
Attachment File Changes: Header 1. File 'Sign-In Sheet Walk Through 1-12-2017.pdf': File 'Sign-In Sheet Walk Through 1-12-2017.pdf' added . Enrollment Date Changes:
9
01/17/2017 02:49:02 PM
Attachment File Changes: Header 1. File 'Addendum No. 2': File 'Addendum No. 2' added . Enrollment Date Changes:
10
01/19/2017 04:30:47 PM
Attachment File Changes: Header 1. File 'Sign-In Sheet Walk Through 1-19-2017': File 'Sign-In Sheet Walk Through 1-19-2017' added . Enrollment Date Changes:
11
01/20/2017 12:09:48 PM
Attachment File Changes: Header 1. File 'Sign-In Sheet Walk Through 1-19-2017': File 'Sign-In Sheet Walk Through 1-19-2017' deleted . 2. File 'Sign-In Sheet Walk Through 1-19-2017~1.pdf': File 'Sign-In Sheet Walk Through 1-19-2017~1.pdf' added . Enrollment Date Changes:
12
01/27/2017 05:56:55 PM
Attachment File Changes: Header 1. File '0902-M-FP-007 REV-1-20-17.pdf': File '0902-M-FP-007 REV-1-20-17.pdf' added . 2. File '0902-M-SH-013 REV-1-20-17.pdf': File '0902-M-SH-013 REV-1-20-17.pdf' added . 3. File '0902-M-SH-014 REV 1-20-17 (2).pdf': File '0902-M-SH-014 REV 1-20-17 (2).pdf' added . 4. File '0902-P-SH-022 REV-1-20-17.pdf': File '0902-P-SH-022 REV-1-20-17.pdf' added . 5. File '0902-E-LP-029 REV 1-20-17.pdf': File '0902-E-LP-029 REV 1-20-17.pdf' added . 6. File '0902-E-SH-032 REV-1-20-17.pdf': File '0902-E-SH-032 REV-1-20-17.pdf' added . 7. File '0902-E-DT-033 REV 1-20-17.pdf': File '0902-E-DT-033 REV 1-20-17.pdf' added . 8. File 'Columbia Gas Layout Sheet.pdf': File 'Columbia Gas Layout Sheet.pdf' added . 9. File 'Taunton State Hospital Site Plan.pdf': File 'Taunton State Hospital Site Plan.pdf' added . 10. File 'Columbia Gas Excavation for Natural Gas Mains and Services.pdf': File 'Columbia Gas Excavation for Natural Gas Mains and Services.pdf' added . 11. File 'Meter Placement Guide.pdf': File 'Meter Placement Guide.pdf' added . 12. File 'Energy Analysis - Besse.xls': File 'Energy Analysis - Besse.xls' added . 13. File 'Energy Analysis - Cain.xls': File 'Energy Analysis - Cain.xls' added . 14. File 'Energy Analysis - Chambers- aka Glass.xls': File 'Energy Analysis - Chambers- aka Glass.xls' added . 15. File 'Energy Analysis - Cottage No. 5 6 8.xls': File 'Energy Analysis - Cottage No. 5 6 8.xls' added . 16. File 'Energy Analysis - Glass House.xls': File 'Energy Analysis - Glass House.xls' added . 17. File 'Energy Analysis - Goss.xls': File 'Energy Analysis - Goss.xls' added . 18. File 'Energy Analysis - Learoyd.xls': File 'Energy Analysis - Learoyd.xls' added . 19. File 'Energy Analysis - Lighting and Water Calcs.xlsx': File 'Energy Analysis - Lighting and Water Calcs.xlsx' added . 20. File 'Energy Analysis - Summary Table.xlsm': File 'Energy Analysis - Summary Table.xlsm' added . 21. File 'Energy Analysis - Sylvia Rec Center.xls': File 'Energy Analysis - Sylvia Rec Center.xls' added . 22. File 'Energy Analysis -Power Plant.xls': File 'Energy Analysis -Power Plant.xls' added . 23. File 'TSH Utility Spreadsheet.xls': File 'TSH Utility Spreadsheet.xls' added . Enrollment Date Changes:
13
02/01/2017 09:33:01 AM
Attachment File Changes: Header 1. File 'Addendum No. 3.pdf': File 'Addendum No. 3.pdf' added . 2. File 'FormsBCD_DMH0902EC1_Revision1.xlsx': File 'FormsBCD_DMH0902EC1_Revision1.xlsx' added . 3. File 'Performance_Specification_DMH0902EC1 REV Jan 2017.pdf': File 'Performance_Specification_DMH0902EC1 REV Jan 2017.pdf' added . 4. File 'Form_E_DMH0902EC1 Revision1.xlsx': File 'Form_E_DMH0902EC1 Revision1.xlsx' added . Enrollment Date Changes:
14
02/01/2017 09:45:15 AM
Header 1. Bid Opening Date changed from "02/09/2017 02:00:00 PM" to "02/21/2017 02:00:00 PM". Enrollment Date Changes:
15
03/06/2017 03:30:42 PM
Proposals Received/Opened on February 21, 2017 Attachment File Changes: Header 1. File 'DMH0902_ProposalOpening_2_21_17.pdf': File 'DMH0902_ProposalOpening_2_21_17.pdf' added . Enrollment Date Changes:
16
03/05/2018 01:05:24 PM
Contractor Selection Letter Attachment File Changes: Header 1. File 'DMH0902_EC1_ENE_AwardLetter_11_17.pdf': File 'DMH0902_EC1_ENE_AwardLetter_11_17.pdf' added . Enrollment Date Changes:
Item Information
Item # 1: ( 72-13 - 00 )
A contract to finalize design, install, and commission various ECMs, including exterior and interior lighting, lighting controls, energy management system, base mechanical upgrades, kitchen hood controls, water conservation measures, steam trap service, fan VFDs and related controls, pipe insulation, vending misers, building weatherization, boiler combustion controls, rooftop units replacement, power factor correction and general building code upgrades. The alternate ECMs include high efficiency motors, boiler replacement, sub meters and de-stratification fans.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status