You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-16-1019-DCP04-BID01-00000005669
Header Information
Bid Number:
BD-16-1019-DCP04-BID01-00000005669
Description:
DCP1353 FC1, Garage Drainage Repairs, McCormack State Office Building, 1 Ashburton Place, Boston, MA
Bid Opening Date:
10/28/2015 02:00:00 PM
Purchaser:
Dana Rizzotti
Organization:
Division of Capital Asset Management and Maintenance
Department:
DCP04 - Bid Room
Location:
BID01 - Bid Room
Fiscal Year:
16
Type Code:
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
09/30/2015 08:30:00 AM
Info Contact:
Dana Rizzotti, 857-204-1460, Dana.rizzotti@state.ma.us
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
The pre-bid informational meeting will be held on Thursday, October 8, 2015 @10:00 AM at McCormack Building Lobby, contact Jay Western, 857-204-1556.
Bulletin Desc:
The project includes but is not limited to removal of existing drainage piping and replacement with high silicone content cast piping. Jet clean, video camera, and epoxy line the 4th level garage drainage piping. Installation of new ejector pumps with high water alarm.
Ship-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Bill-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Print Format:
File Attachments:
Legal Ad
Form Attachments:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Item Information
Item # 1: ( 72-13 - 00 )
The project includes but is not limited to removal of existing drainage piping and replacement with high silicone content cast piping. Jet clean, video camera, and epoxy line the 4th level garage drainage piping. Installation of new ejector pumps with high water alarm.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status