You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-15-1019-DCP08-ENR01-00000002529
Header Information
Bid Number:
BD-15-1019-DCP08-ENR01-00000002529
Description:
DPH1350E-EC1, Mass State Lab / JP Hinton - Energy Design Build Project
Bid Opening Date:
03/06/2015 02:00:00 PM
Purchaser:
Raymond Soohoo
Organization:
Division of Capital Asset Management and Maintenance
Department:
DCP08 - Energy Group
Location:
ENR01 - Energy Group
Fiscal Year:
15
Type Code:
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
12/09/2014 07:00:00 PM
Info Contact:
John Crisley at DCAMM (john.crisley@state.ma.us) 617-727-4030 ext. 31561
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Pre-bid scheduled for Thursday, December 18th, at 10 AM at the MA State Lab. Proposers are strongly encourged to register in advance with the DCAMM project contact (John Crisley).
Bulletin Desc:
Commonwealth is procuring an energy upgrade project at the MA State Lab/JP Hinton.
Ship-to Address:
DCAMM
1 Ashburton Place
Room 1607
Boston, MA 02108
US
Email: edward.ransom@state.ma.us
Phone: (857)204-1487
Bill-to Address:
DCAMM
1 Ashburton Place
Room 1607
Boston, MA 02108
US
Email: edward.ransom@state.ma.us
Phone: (857)204-1487
Print Format:
File Attachments:
MA State Lab Form A Cover Letter
MA State Lab From F Questions
MA State Lab Form E Tables
MA State Lab Energy Study
MA State Lab Basis of Design
MA State Lab Basis of Design Drawings
MA State Lab Financial Forms B/C/D
MA State Lab AEP Audit Template
MA State Lab Energy Services Agreement ESA
MA State Lab DCAMM FIle Release Form
MA State Lab Prevailing Wage Sheets
MA State Lab SDO Certified Companies List
MA State Lab Energy Project RFP
MA State Lab Attendance List from 12/18/14
Presentation Slides from 12/18/14 Pre-Bid Meeting
DPH1350E-EC1_AddendumNo1_12_23_14.dotx.pdf
MA State Lab Pre Proposal Meeting MINUTES
MA State Lab Addendum Number 2
DPH1350E-EC1 Site Visit Attendance List from 12/30/2014
DPH1350E_EC1_SiteVisit_1_13_15
Addendum Number 3
BAS Naming Standard for ECM 4.00
MA State Lab Addendum Number 4
MA State Lab First Set of Q&A
MA State Lab Revised Form E Tables
MA State Lab Revised Financial Forms BCD
MA State Lab Revised AEP Audit Template
MA State Lab HVAC Section 05 Revised
MA State Lab Introduction Section 01-3 Update
MA State Lab Site Civil Page 1 Update
MA State Lab RFP Page 6 Revised
MA State Lab RFP Page 33 Revised
MA State Lab ECM Summary Matrix Revised
MA State Lab BOD Section 011000 Revised
MA State Lab Schedule C Table C-1 Revised
MA State Lab Boiler Calculations ECM 14.02
DPH1350E_EC1_AddendumNo5_2_13_15.pdf
DPH1350_EC1_QuestionsNo2_FEB26_2015.pdf
DPH1350E_EC1_SiteVisit_2_24_15.pdf
NTP DPH1350E EC1.pdf
Form Attachments:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment #
Amendment Date
Amendment Note
1
12/18/2014 03:30:25 PM
MA State Lab Attendance List and Presentation slides from 12/18/14 meeting at facility Attachment File Changes: Header 1. File 'MA State Lab Attendance List from 12/18/14': File 'MA State Lab Attendance List from 12/18/14' added . DCAMM bid amendment: attendance list from 12/18/14 pre-bid meeting 2. File 'Presentation Slides from 12/18/14 Pre-Bid Meeting': File 'Presentation Slides from 12/18/14 Pre-Bid Meeting' added . DCAMM bid amendment: presentation slides from 12/18/14 meeting
2
12/22/2014 04:30:53 PM
MA State Lab REVISED Project Schedule Issued 12/22/2014 Attachment File Changes: Header 1. File 'DPH1350E-EC1_AddendumNo1_12_23_14.dotx.pdf': File 'DPH1350E-EC1_AddendumNo1_12_23_14.dotx.pdf' added . MA State Lab REVISED Project Schedule Issued 12/22/2014
3
12/23/2014 03:57:09 PM
MINUTES from the 12/18/2014 pre-proposal meeting at the MA State Lab. Site visit dates and times update. Attachment File Changes: Header 1. File 'MA State Lab Pre Proposal Meeting MINUTES': File 'MA State Lab Pre Proposal Meeting MINUTES' added . MINUTES from 12/18/2014 pre-proposal meeting. Second amendment notes next two site visits scheduled for 12/30/14 and 1/13/2015 scheduled for 10 AM. 2. File 'MA State Lab Addendum Number 2': File 'MA State Lab Addendum Number 2' added . MINUTES from 12/18/14 pre-proposal meeting. Site visit dates and times update.
4
12/30/2014 03:44:50 PM
DPH1350E-EC1 Attendance List from Site Visit on 12/30/2014 at Mass State Lab Attachment File Changes: Header 1. File 'DPH1350E-EC1 Site Visit Attendance List from 12/30/2014': File 'DPH1350E-EC1 Site Visit Attendance List from 12/30/2014' added . DPH1350E-EC1 Attendance List from 12/30/2014 Site visit at Mass State Lab
5
01/13/2015 02:38:04 PM
DPH1350E-EC1: Attendance list for Site Visit on 1/13/2015 at the Mass State Lab Attachment File Changes: Header 1. File 'DPH1350E_EC1_SiteVisit_1_13_15': File 'DPH1350E_EC1_SiteVisit_1_13_15' added . DPH1350E-EC1: Attendance list for Site Visit on 1/13/2015 at the Mass State Lab
6
01/26/2015 04:25:13 PM
Addendum Number 3 adds a fourth and final site visit on 2/3/2015. It adds a BAS Naming Standard for ECM 4.00 Attachment File Changes: Header 1. File 'Addendum Number 3': File 'Addendum Number 3' added . 2. File 'BAS Naming Standard for ECM 4.00': File 'BAS Naming Standard for ECM 4.00' added .
7
02/05/2015 05:14:16 PM
MA State Lab Addendum Number 4 and First Set of Q&A Attachment File Changes: Header 1. File 'MA State Lab Addendum Number 4': File 'MA State Lab Addendum Number 4' added . 2. File 'MA State Lab First Set of Q&A': File 'MA State Lab First Set of Q&A' added . 3. File 'MA State Lab Revised Form E Tables': File 'MA State Lab Revised Form E Tables' added . 4. File 'MA State Lab Revised Financial Forms BCD': File 'MA State Lab Revised Financial Forms BCD' added . 5. File 'MA State Lab Revised AEP Audit Template': File 'MA State Lab Revised AEP Audit Template' added . 6. File 'MA State Lab HVAC Section 05 Revised': File 'MA State Lab HVAC Section 05 Revised' added . 7. File 'MA State Lab Introduction Section 01-3 Update': File 'MA State Lab Introduction Section 01-3 Update' added . 8. File 'MA State Lab Site Civil Page 1 Update': File 'MA State Lab Site Civil Page 1 Update' added . 9. File 'MA State Lab RFP Page 6 Revised': File 'MA State Lab RFP Page 6 Revised' added . 10. File 'MA State Lab RFP Page 33 Revised': File 'MA State Lab RFP Page 33 Revised' added . 11. File 'MA State Lab ECM Summary Matrix Revised': File 'MA State Lab ECM Summary Matrix Revised' added . 12. File 'MA State Lab BOD Section 011000 Revised': File 'MA State Lab BOD Section 011000 Revised' added . 13. File 'MA State Lab Schedule C Table C-1 Revised': File 'MA State Lab Schedule C Table C-1 Revised' added . 14. File 'MA State Lab Boiler Calculations ECM 14.02': File 'MA State Lab Boiler Calculations ECM 14.02' added .
8
02/13/2015 11:06:55 AM
Proposal Due date extended to Friday, March 6, 2015 at 2:00 PM. Header 1. Bid Opening Date changed from "02/06/2015 02:00:00 PM" to "03/06/2015 11:01:00 AM". Proposal Due date extended to Friday, March 6, 2015 at 2:00 PM.
9
02/13/2015 11:15:01 AM
Proposal Due date extended to March 6,2015 at 2:00 PM and additional site visit for 2/24/15 at 10:00 AM. Header 1. Bid Opening Date changed from "03/06/2015 11:01:00 AM" to "03/06/2015 02:00:00 PM". Attachment File Changes: Header 1. File 'DPH1350E_EC1_AddendumNo5_2_13_15.pdf': File 'DPH1350E_EC1_AddendumNo5_2_13_15.pdf' added .
10
02/26/2015 01:00:57 PM
Second Set of Questions/Answers and Attendance list for 2/24/15 Site Visit Attachment File Changes: Header 1. File 'DPH1350_EC1_QuestionsNo2_FEB26_2015.pdf': File 'DPH1350_EC1_QuestionsNo2_FEB26_2015.pdf' added . 2nd Set of Questions/Answers 2. File 'DPH1350E_EC1_SiteVisit_2_24_15.pdf': File 'DPH1350E_EC1_SiteVisit_2_24_15.pdf' added . Attendance List 2/26/15 Site Visit
11
10/19/2015 10:31:04 AM
Notice to Proceed for MSL Project DPH1350E-EC1 dated 10/1/2015 for J.C. Cannistraro Attachment File Changes: Header 1. File 'NTP DPH1350E EC1.pdf': File 'NTP DPH1350E EC1.pdf' added . Notice To Proceed for MSL DPH1350E-EC1 dated 10/1/2015
Item Information
Item # 1: ( 72-13 - 00 )
DPH1350E-EC1, The Hinton Lab/Mass State Lab facility, located at 305 South Street, Jamaica Plain, Boston, is comprised of 3 buildings, the Tower, Biologics, and Stables buildings. The Biologics building is excluded from this project. The combined square footage of the Tower and Stables is 211,308 sf. The Project includes among others, the final design, procurement, installation, and commissioning of the following energy measures: BAS upgrades for the Tower and Stables buildings, High-Efficiency Boiler Upgrades for the Tower and Stables buildings, CHP system to be located in the Tower boiler plant, Replacement of AHUs in the Tower building, Replacement of VAVs in the Tower building, Point of Use Steam Generators in the Tower building, Gas Metering, plus alternates.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status