You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-15-1019-DCP04-BID01-00000003709
Header Information
Bid Number:
BD-15-1019-DCP04-BID01-00000003709
Description:
RCC1201 DC1, RFQs for CM Services, Major Campus Renovation, Roxbury Community College, Roxbury, MA.
Bid Opening Date:
05/06/2015 02:00:00 PM
Purchaser:
Dana Rizzotti
Organization:
Division of Capital Asset Management and Maintenance
Department:
DCP04 - Bid Room
Location:
BID01 - Bid Room
Fiscal Year:
15
Type Code:
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
04/08/2015 10:45:00 AM
Info Contact:
Dana Rizzotti, 857-204-1460, dana.rizzotti@state.ma.us
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
None.
Bulletin Desc:
The project involves four occupied buildings and is divided into four phases, with a proposed start of construction in January, 2016 and a final completion of work in August, 2017. The first phase involves a major replacement of centralized infrastructure in Buildings 1 through 4, along with accessibility and envelope work for Building 2. The scope in subsequent phases is grouped largely by building and scheduled in such a manner to minimize disruption to the operation of the college.
Ship-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Bill-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Print Format:
File Attachments:
Legal Ad
RFQ
Form Attachments:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment #
Amendment Date
Amendment Note
1
04/08/2015 10:37:12 AM
Header 1. Allow Electronic Response changed from "Yes" to "No".
Item Information
Item # 1: ( 72-13 - 00 )
The project involves four occupied buildings and is divided into four phases, with a proposed start of construction in January, 2016 and a final completion of work in August, 2017. The first phase involves a major replacement of centralized infrastructure in Buildings 1 through 4, along with accessibility and envelope work for Building 2. The scope in subsequent phases is grouped largely by building and scheduled in such a manner to minimize disruption to the operation of the college.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status