You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-15-1019-DCP04-BID01-00000003116
Header Information
Bid Number:
BD-15-1019-DCP04-BID01-00000003116
Description:
DCP1513 HC1, McCormack Carpet Replacement, 3rd Floor, Boston, MA.
Bid Opening Date:
03/18/2015 02:00:00 PM
Purchaser:
Dana Rizzotti
Organization:
Division of Capital Asset Management and Maintenance
Department:
DCP04 - Bid Room
Location:
BID01 - Bid Room
Fiscal Year:
15
Type Code:
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
02/25/2015 08:30:00 AM
Info Contact:
Dana Rizzotti, 857-204 1460, dana.rizzotti@state.ma.us
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Pre-bid walkthrough on Wednesday, 3/4/15 at site @10:30 am in 3rd Floor Elevator Lobby of One Ashburton Place, Boston, MA. Any bidders who would like to attend must contact John C. Ferrara at 857-204-1821 or john.c.ferrara@state.ma.us.
Bulletin Desc:
Remove and recycle existing carpet tile and install new carpet. System furniture is not to be dismantled. Lift all existing system furniture, as well as, move loose furniture and full file cabinets needed to perform work. Twenty (20) library carts and two hundred (200) legal size cardboard moving totes are to be provided. All work to be performed during off-hours (nights after 5:00 pm & weekends starting at 7:00 am). This project bid in accordance with M.G.L. Chapter 30 Section 39M.
Ship-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Bill-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Print Format:
File Attachments:
Legal Ad
Form Attachments:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment #
Amendment Date
Amendment Note
1
02/20/2015 10:46:06 AM
Header 1. Allow Electronic Response changed from "Yes" to "No".
Item Information
Item # 1: ( 72-13 - 00 )
Remove and recycle existing carpet tile and install new carpet. System furniture is not to be dismantled. Successful bidder will lift all existing system furniture, as well as, move loose furniture and full file cabinets needed to perform work. Twenty (20) library carts and two hundred (200) legal size cardboard moving totes are to be provided. All work to be performed during off-hours (nights after 5:00 pm & weekends starting at 7:00 am). This project bid in accordance with M.G.L. Chapter 30 Section 39M.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status