You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-15-1019-DCP04-BID01-00000002505
Header Information
Bid Number:
BD-15-1019-DCP04-BID01-00000002505
Description:
SDH1502 FC1--Hampden County House of Corrections, HVAC Replacement, Ludlow, MA.
Bid Opening Date:
01/16/2015 02:00:00 PM
Purchaser:
Dana Rizzotti
Organization:
Division of Capital Asset Management and Maintenance
Department:
DCP04 - Bid Room
Location:
BID01 - Bid Room
Fiscal Year:
15
Type Code:
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
12/10/2014 08:30:00 AM
Info Contact:
Dana Rizzotti, Bid Room Administrator, 617-727-4030 x31460, dana.rizzotti@state.ma.us
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Pre-Bid Meeting scheduled for Wednesday, December, 17, 2014 at the site @9:00 AM, meet inside the lobby of the visitors' entrance. Call David Asselin at 413-547-8000 x2403 for a copy of the Vendor Clearance Form.
Bulletin Desc:
The work of this contract consists of removing and replacing rooftop units and installing air purification systems in the two housing towers within the secure prison. Deadline for Filed Sub-Bids in the following three (3) categories: Plumbing, HVAC, Electrical is December 29, 2014 at 12:00 PM.
Ship-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Bill-to Address:
DCAMM Bid Room
1 Ashburton Place, 15th Floor
Boston, MA 02108
US
Email: bidroom.dcamm@state.ma.us
Phone: (617)727-4003
Print Format:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment #
Amendment Date
Amendment Note
1
12/08/2014 02:03:34 PM
Header 1. Allow Electronic Response changed from "Yes" to "No".
2
12/24/2014 11:34:27 AM
Header 1. Bid Opening Date changed from "01/12/2015 02:00:00 PM" to "01/16/2015 02:00:00 PM". Item 1 1. Description changed from "The work of this contract consists of removing and replacing rooftop units and installing air purification systems in the two housing towers within the secure prison." to "The work of this contract consists of removing and replacing rooftop units and installing air purification systems in the two housing towers within the secure prison. Per ADDENDUM NO. 1, the date for sumittal of Filed Sub-Bids has been exteneded from Monday, December 29, 2014 at noon to Tuesday, January 6, 2015 at noon. The date for submittal of General bids has been extended from Monday, January 12, 2015 at 2 PM to Friday, January 16, 2015 at 2 PM.".
Item Information
Item # 1: ( 72-13 - 00 )
The work of this contract consists of removing and replacing rooftop units and installing air purification systems in the two housing towers within the secure prison. Per ADDENDUM NO. 1, the date for sumittal of Filed Sub-Bids has been exteneded from Monday, December 29, 2014 at noon to Tuesday, January 6, 2015 at noon. The date for submittal of General bids has been extended from Monday, January 12, 2015 at 2 PM to Friday, January 16, 2015 at 2 PM.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item Attachments:
Legal Ad
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status