You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-20-1244-DPW-DPWOG-42877
Header Information
Bid Number:
BD-20-1244-DPW-DPWOG-42877
Description:
Fawn Lake Dredging and Dam Improvements
Bid Opening Date:
08/29/2019 09:00:00 AM
Purchaser:
Karen Kennedy
Organization:
Town of Bedford
Department:
DPW - Department of Public Works
Location:
DPWOG - DPW Office Garage
Fiscal Year:
20
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
08/12/2019 02:00:00 PM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A non-mandatory pre-bid conference is scheduled for Tuesday, August 20, 2019 at 11:00 a.m. to be held on site at 99 Sweetwater Avenue, Bedford, MA.
Bulletin Desc:
Hydraulic dredging of approximately 30,000 cubic yards of accumulated bottom sediments, dewatering and disposal of approximately 8,000 cubic yards of dewatered residuals and reinforcement of the Fawn Lake earthen dam with sheet piling and additional lake-side fill.The project includes hydraulic in-lake dredging, slurry dewatering by mobile filter press, treatment of decant for turbidity before release back into Fawn Lake, off-site disposal of pressed solids, installation of a cofferdam, etc.
Ship-to Address:
Karen Kennedy
314 Great Road
Bedford, MA 01730
US
Email: kkennedy@bedfordma.gov
Phone: (781)275-7605
Bill-to Address:
Karen Kennedy
314 Great Road
Bedford, MA 01730
US
Email: kkennedy@bedfordma.gov
Phone: (781)275-7605
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 72-15 - 00 )
Hydraulic dredging of approximately 30,000 cubic yards of accumulated bottom sediments, dewatering and disposal of approximately 8,000 cubic yards of dewatered residuals and reinforcement of the Fawn Lake earthen dam with sheet piling and additional lake-side fill. Includes hydraulic in-lake dredging, slurry dewatering by mobile filter press, treatment of decant for turbidity before release back into Fawn Lake, off-site disposal of pressed solids, installation of a cofferdam, excavation, dewatering, earthwork, siltation control, steel sheeting and other incidental items necessary to complete the required work.
U N S P S C Code:
72-15-00
Specialized trade construction and maintenance services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status