You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-19-1412-PRCH1-PRCH1-33536
Header Information
Bid Number:
BD-19-1412-PRCH1-PRCH1-33536
Description:
O'CONNELL SOUTH COMMON & SULLIVAN PARK RESTORATION IFB
Bid Opening Date:
12/12/2018 11:00:00 AM
Purchaser:
Rita Brousseau
Organization:
City of Lawrence
Department:
PRCH1 - Purchasing Department
Location:
PRCH1 - Purchasing Department
Fiscal Year:
19
Type Code:
NS
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
11/29/2018 12:02:18 PM
Info Contact:
Rita V. Brousseau, Chief Procurement Officer, rbrousseau@cityoflawrence.com
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Wednesday, December 5, 2018 at 2:00 p.m. Bidders shall meet at the O?Connell South Common at the corner of Market & Osgood Streets.
Bulletin Desc:
Download bid package at www.cityoflawrence.com/bids.
Ship-to Address:
Jannelvy Martinez
200 Common Street
3rd Floor, Room 301
Lawrence, MA 01840
US
Email: jannelvymartinez@cityoflawrence.com
Phone: (978)620-3242
Bill-to Address:
Jannelvy Martinez
200 Common Street
3rd Floor, Room 301
Lawrence, MA 01840
US
Email: jannelvymartinez@cityoflawrence.com
Phone: (978)620-3242
Print Format:
Bid Print
File Attachments:
OConnell South Common and Sullivan Park Restoration IFB~1.pdf
Form Attachments:
Required Quote Attachments
Item Information
Item # 1: ( 30-12 - 00 )
SULLIVAN SITE IMPROVEMENTS Remove and dispose of off-site in its entirety tennis courts and basketball courts, including all pavement, subbase, fencing, fencing foundations, net posts, goal posts, and appurtenant items; Reconstruct tennis courts and basketball courts including subbase, asphaltic pavement, acrylic coatings, net posts and hold downs, goal posts and goals, and all fencing and gates; Remove and replace damaged concrete sidewalk and curbing in locations shown on the plans, including sawcutting, disposal, new 4in thick concrete walks and new granite curbing. Place expansion joint at each interface of new and existing work. Mill and overlay top 1.5in of existing bituminous concrete pathways; At completion of work, Contractor shall ensure that all plastic, metal, wood, concrete, asphalt, and other material scraps, as well as any other construction and demolition debris are removed and legally disposed of off-site; All disturbed areas, not otherwise treated, shall be loamed, fine graded and hydroseeded; OCONNELL SOUTH COMMON Remove and dispose of off-site ALL temporary milling drives to a depth of 6in below the millings, and replace with loam flush with surrounding ground; Remove and dispose of off-site in its entirety the basketball court, including all pavement, subbase, poles, foundations, hoops, and appurtenant items, and replace with loam flush with surrounding ground; Remove and dispose of off-site in its entirety the hockey court subbase, and replace with loam flush with surrounding ground; Remove and replace damaged concrete sidewalk and curbing in the locations shown on the plans, including saw-cutting, disposal, new 4in thick concrete walks and new precast concrete curbing. Place expansion joint at interface of new and existing work. Construct two new ball fields on the eastern one-third of the site, including disking existing soils to a depth of 6in, fine grading, addition of 3in of new loam, seeding, construction of skinned infields, mounds, base running paths, and base foundations. Work also includes new concrete bleacher pads and concrete sidewalks. Complete restoration of this eastern 1/3 of the site is included in the base bid. Mill and overlay top 1.5in of existing bituminous concrete pathways; All disturbed areas, not otherwise treated, shall be loamed, fine graded and hydroseeded; At completion of work, Contractor shall ensure that all plastic, metal, wood, concrete, asphalt, and other material scraps, as well as any other construction and demolition debris are removed and legally disposed of off-site;
U N S P S C Code:
30-12-00
Roads and landscape
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item Attachments:
OConnell South Common and Sullivan Park Restoration IFB.pdf
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status