You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-19-1331-DPWSU-DPW-40689
Header Information
Bid Number:
BD-19-1331-DPWSU-DPW-40689
Description:
Catch Basin Adjustments
Bid Opening Date:
06/25/2019 10:30:00 AM
Purchaser:
Denise Barter
Organization:
Town of Sudbury
Department:
DPWSUD - DPW
Location:
DPW - DPW SUD
Fiscal Year:
19
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
2019-CBA-1
Required Date:
Available Date :
06/06/2019 10:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
The work to be done under this contract shall include the furnishing of all labor, materials, tools and equipment to construct Town wide Drainage casting adjustment, rebuild, remodel, and installation of granite curb inlets as directed by the Public Works Director or his agent.
Ship-to Address:
Denise Barter
275 Old Sudbury Rd
Sudbury, MA 01776
US
Email: barterd@sudbury.ma.us
Phone: (978)440-5422
Bill-to Address:
Denise Barter
275 Old Sudbury Rd
Sudbury, MA 01776
US
Email: barterd@sudbury.ma.us
Phone: (978)440-5422
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 70-17 - 18 )
DO NOT REPLY IN COMMBUYS: The work to be done under this contract shall include the furnishing of all labor, materials, tools and equipment to construct Town wide Drainage casting adjustment, rebuild, remodel, and installation of granite curb inlets as directed by the Public Works Director or his agent. Before reinstalling the grates, the rims or seats shall all be cleaned so that they fit properly in place. Care shall be taken by the Contractor not to damage the grate, frame, catch basin, pipe or curbing. If damage is caused by the negligence of the Contractor, the damaged parts shall be satisfactorily repaired or replaced at his own expense. No uncovered catch basin shall be left unattended at any time. Covers shall be replaced immediately after work on the structure is completed. Any material falling on the roadway shall be removed at Contractors expense. All construction is to be done during normal working hours of the Town of Sudbury Public Works Department. The Director of the Department of Public Works or his agent reserves the right to inspect the Bidders work being performed.
U N S P S C Code:
70-17-18
Drainage services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status