You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-19-1310-00029-00029-33883
Header Information
Bid Number:
BD-19-1310-00029-00029-33883
Description:
SRE Building Fit-Out at Norwood Airport
Bid Opening Date:
01/16/2019 11:00:00 AM
Purchaser:
Jason Adams
Organization:
Town of Norwood
Department:
00029 - Purchasing Dept.
Location:
00029 - Norwood Town Hall
Fiscal Year:
19
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
12/13/2018 03:00:00 PM
Info Contact:
Catherine Carney (781) 762-1240 x107
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
12/18/18 @ 11:00 A.M., Norwood Memorial Airport, 125 Access Road, Norwood, MA 02062
Bulletin Desc:
Norwood Memorial Airport SRE Building Fit-Out including filed sub-trades. Requires DCAMM certification in General Building Construction for General Bids. Filed sub-bids opening 1/7/19 @ 11:00 A.M., General Bids opening 1/16/19 @ 11:00 A.M. Refundable spec deposit of $100 (check only). Documents can be downloaded electronically by registering/downloading at: https://bids.norwoodma.gov.
Ship-to Address:
Jason Adams
566 Washington Street
Norwood Town Hall
Norwood, MA 02062
US
Email: jadams@norwoodma.gov
Phone: (781)762-8813
FAX: (781)278-3015
Bill-to Address:
Jason Adams
566 Washington Street
Norwood Town Hall
Norwood, MA 02062
US
Email: jadams@norwoodma.gov
Phone: (781)762-8813
FAX: (781)278-3015
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 72-13 - 00 )
Norwood Memorial Airport SRE Building Fit-Out including filed sub-trades. Requires DCAMM certification in General Building Construction for General Bids. Filed sub-bids opening 1/7/19 @ 11:00 A.M., General Bids opening 1/16/19 @ 11:00 A.M. Refundable spec deposit of $100 (check only). Documents can be downloaded electronically by registering/downloading at: https://bids.norwoodma.gov.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status