You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-19-1030-0P100-0P070-33249
Header Information
Bid Number:
BD-19-1030-0P100-0P070-33249
Description:
Rail-South Coast Rail Early Action Culverts
Bid Opening Date:
01/16/2019 02:00:00 PM
Purchaser:
Monica Auguste
Organization:
Department of Transportation
Department:
0T100 - RAIL AND TRANSIT
Location:
0T281 - RAIL Departmental Contracts
Fiscal Year:
19
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
Yes
Alternate Id:
609258-106341
Required Date:
Available Date :
11/17/2018 10:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
The Pre-Bid Meeting will be on November 20, 2018 at the MBTA Middleborough Layover Facility at 65 West Clark St, Middleborough, MA 02346 at 9:00am, with an on-site inspection immediately following the meeting.
Bulletin Desc:
All attendees accessing the Railroad R-O-W must have the proper Personal Protection Equipment required by MassCoastal Railroad including reflective vest, hardhat, safety glasses, long pants, and safety toed boots. Prospective Bidders to provide their own hi-rail truck, or provide the number of attendees to kdobosz@mbta.com and cc?d to Abrunn@hntb.com by 4PM on Friday November 16, 2018. Bidders are limited to two people per Contractor.
Ship-to Address:
RAIL AND TRANSIT
10 Park Plaza
Suite 4160
Boston, MA 02116
US
Email: noemail@noemail.com
Phone: (999)999-9999
Bill-to Address:
RAIL AND TRANSIT
10 Park Plaza
Suite 4160
Boston, MA 02116
US
Email: noemail@noemail.com
Phone: (999)999-9999
Print Format:
File Attachments:
MS_20181204_SCR_Phase1_EACAddeda 2_Rev00_JVVH_AXB.pdf
MS_20181207_SCR_Phase1_EACAddenda 3_Rev00_JVVH_AXB.pdf
MS_20181220_SCR_Phase1_EACAddenda 5_Rev00_JVVH_AXB.pdf
MS_20181221_SCR_Phase1_EACAddenda 6_Rev00_JVVH_AXB.pdf
MS_20181227_SCR_Phase1_EACAddenda 7_Rev00_JVVH_AXB.pdf
MS_20190109_SCR_Phase1_EACAddenda 8_Rev00_JVVH_AXB.pdf
Apparent 3 Lowest Bidders Forn SCR Early Action Culverts.pdf
MS_20181127_SCR_Phase1_EACAddend 1_Rev00_JVVH_AXB.pdf
SI_20181120_SCR_Phase1_EAC_PreBid_Rev00_JVVH_AJB.PDF
CR_20181116_CONTROLLED_IFB_Phase1_EarlyActionCulvert_Rev00_JVVH_ALB.pdf
VOL 1_Culverts_IssuedForBid.pdf
VOL 2_TarkilnHill_IssuedForBid.pdf
Form Attachments:
Required Quote Attachments
SBPP (Small Business Purchasing Program) Eligible?:
YES
See SBPP requirements and exceptions at www.mass.gov/sbpp :
Amendments:
Amendment #
Amendment Date
Amendment Note
1
11/30/2018 03:30:37 PM
added Addendum #1 and Pre-Bid Sign-in Sheets Attachment File Changes: Header 1. File 'MS_20181127_SCR_Phase1_EACAddend 1_Rev00_JVVH_AXB.pdf': File 'MS_20181127_SCR_Phase1_EACAddend 1_Rev00_JVVH_AXB.pdf' added . 2. File 'SI_20181120_SCR_Phase1_EAC_PreBid_Rev00_JVVH_AJB.PDF': File 'SI_20181120_SCR_Phase1_EAC_PreBid_Rev00_JVVH_AJB.PDF' added . 3. File 'CR_20181116_CONTROLLED_IFB_Phase1_EarlyActionCulvert_Rev00_JVVH_ALB.pdf': Order changed from "0" to "3". 4. File 'VOL 1_Culverts_IssuedForBid.pdf': Order changed from "0" to "4". 5. File 'VOL 2_TarkilnHill_IssuedForBid.pdf': Order changed from "0" to "5". Enrollment Date Changes:
2
12/04/2018 12:50:00 PM
Attachment File Changes: Header 1. File 'MS_20181204_SCR_Phase1_EACAddeda 2_Rev00_JVVH_AXB.pdf': File 'MS_20181204_SCR_Phase1_EACAddeda 2_Rev00_JVVH_AXB.pdf' added . Enrollment Date Changes:
3
12/07/2018 01:34:10 PM
Attachment File Changes: Header 1. File 'MS_20181207_SCR_Phase1_EACAddenda 3_Rev00_JVVH_AXB.pdf': File 'MS_20181207_SCR_Phase1_EACAddenda 3_Rev00_JVVH_AXB.pdf' added . Enrollment Date Changes:
4
12/14/2018 04:57:45 PM
Addendum#4 Attachment File Changes: Header 1. File 'South Coast Rail Culverts Questions 4.docx': File 'South Coast Rail Culverts Questions 4.docx' added . Enrollment Date Changes:
5
12/18/2018 10:39:13 AM
Addendun # 4 Attachment File Changes: Header 1. File 'MS_20181214_SCR_Phase1_EACAddenda 4_Rev00_JVVH_AXB~1.PDF': File 'MS_20181214_SCR_Phase1_EACAddenda 4_Rev00_JVVH_AXB~1.PDF' added . Enrollment Date Changes:
6
12/20/2018 12:16:58 PM
Attachment File Changes: Header 1. File 'South Coast Rail Culverts Questions 4.docx': Confidential Attachment Flag changed from "No" to "Yes". 2. File 'South Coast Rail Culverts Questions 4.docx': Show Attachment to Vendor Flag changed from "Yes" to "No". Enrollment Date Changes:
7
12/21/2018 01:30:25 PM
Attachment File Changes: Header 1. File 'MS_20181220_SCR_Phase1_EACAddenda 5_Rev00_JVVH_AXB.pdf': File 'MS_20181220_SCR_Phase1_EACAddenda 5_Rev00_JVVH_AXB.pdf' added . Enrollment Date Changes:
8
12/21/2018 03:12:55 PM
addendum #6 Attachment File Changes: Header 1. File 'MS_20181221_SCR_Phase1_EACAddenda 6_Rev00_JVVH_AXB.pdf': File 'MS_20181221_SCR_Phase1_EACAddenda 6_Rev00_JVVH_AXB.pdf' added . Enrollment Date Changes:
9
12/27/2018 04:42:52 PM
addendum 7 Attachment File Changes: Header 1. File 'MS_20181227_SCR_Phase1_EACAddenda 7_Rev00_JVVH_AXB.pdf': File 'MS_20181227_SCR_Phase1_EACAddenda 7_Rev00_JVVH_AXB.pdf' added . Enrollment Date Changes:
10
01/04/2019 02:51:43 PM
Header 1. Bid Opening Date changed from "01/09/2019 02:00:00 PM" to "01/16/2019 02:00:00 PM". Enrollment Date Changes:
11
01/09/2019 02:52:57 PM
Addendum 8 Attachment File Changes: Header 1. File 'MS_20190109_SCR_Phase1_EACAddenda 8_Rev00_JVVH_AXB.pdf': File 'MS_20190109_SCR_Phase1_EACAddenda 8_Rev00_JVVH_AXB.pdf' added . Enrollment Date Changes:
12
01/15/2019 10:29:13 AM
Bid opening 1/16/19 @2PM 10 Park plaza, suite 4160, Finance Conference Room, Boston MA 02116 Enrollment Date Changes:
13
01/16/2019 02:49:53 PM
Attachment File Changes: Header 1. File 'Apparent 3 Lowest Bidders Forn SCR Early Action Culverts.pdf': File 'Apparent 3 Lowest Bidders Forn SCR Early Action Culverts.pdf' added . Enrollment Date Changes:
14
10/16/2019 10:57:47 AM
Attachment File Changes: Header 1. File 'MS_20181214_SCR_Phase1_EACAddenda 4_Rev00_JVVH_AXB~1.PDF': File 'MS_20181214_SCR_Phase1_EACAddenda 4_Rev00_JVVH_AXB~1.PDF' deleted . Enrollment Date Changes:
Item Information
Item # 4: ( 72-14-00-00 )
South Coast Rail Early Action Culverts-The work will take place in various locations over the length of the Middleborough Secondary, the New Bedford Main Line, and the Fall River Secondary. The work consists of the removal and replacement of forty-six existing culverts and the removal without replacement of one existing culvert that cross railroad rights of way; the cleaning of sixteen existing culverts that cross railroad rights of way; improvements to the existing storm drainage system at the Tarkiln Hill Road railroad grade crossing and improvements to the roadways in the railroad grade crossing area; the construction of six wetlands impact mitigation areas adjacent to railroad rights of way.
U N S P S C Code:
72-14-00
Heavy construction services
72-14-00-00
Heavy construction services
72-14-00-00
Heavy construction services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
Manufacturer:
Brand:
Model:
Make:
Packaging:
Bill-to Address:
Chief Financial Office Unit
10 Park Plaza
Boston, MA 02116
Email: Noname@state.ma.us
Phone: (999)999-9999
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status