You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-18-1303-NEE08-NDM21-28801
Header Information
Bid Number:
BD-18-1303-NEE08-NDM21-28801
Description:
Alden Road Sewer Pump Station Replacement Project
Bid Opening Date:
07/27/2018 11:00:00 AM
Purchaser:
Stephen Nadeau
Organization:
Town of Needham
Department:
NEE08 - Department of Public Works
Location:
NDM21 - DPW - Engineering
Fiscal Year:
18
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
IFB 19DPW039C
Required Date:
07/27/2018
Available Date :
06/27/2018 09:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A pre-bid meeting will be held in the Charles River Room on July 12, 2018 at 12:00 P.M.
Bulletin Desc:
Unit Price Contract Bid (see Sect. 3.1, Art.1) to furnish labor, materials, and equipment necessary for various sewer system rehabilitation construction and appurtenant work therein. Modifications to existing facilities include replacement of all pumping equipment with two new dry pit submersible pumps, a new wet well, control systems, alarm monitoring and transmission systems, and all related electrical and instrumentation control work, yard piping and site work.
Ship-to Address:
Thomas Ryder
500 Dedham Avenue (2nd Floor)
DPW - Engineering
Needham, MA 02492
US
Email: pcentral@needhamma.gov
Phone: (781)455-7550
Bill-to Address:
Thomas Ryder
500 Dedham Avenue (2nd Floor)
DPW - Engineering
Needham, MA 02492
US
Email: pcentral@needhamma.gov
Phone: (781)455-7550
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 72-13 - 17 )
Unit Price Contract Bid (see Sect. 3.1, Art.1) to furnish labor, materials, and equipment necessary for various sewer system rehabilitation construction and appurtenant work therein. Modifications to existing facilities include replacement of all pumping equipment with two new dry pit submersible pumps, a new wet well, control systems, alarm monitoring and transmission systems, and all related electrical and instrumentation control work, yard piping and site work.
U N S P S C Code:
72-13-17
Infrastructure construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status