You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-18-1142-PFD01-PFD01-22714
Header Information
Bid Number:
BD-18-1142-PFD01-PFD01-22714
Description:
#7085A M.G.L.c.149A, §8, Boston Arts Academy Enabling Swing Space Project
Bid Opening Date:
02/01/2018 02:00:00 PM
Purchaser:
BID COUNTER
Organization:
City of Boston
Department:
PFD01 - Public Facilities Department
Location:
PFD01 - Public Facilities Department
Fiscal Year:
18
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
01/10/2018 09:00:00 AM
Info Contact:
bid.info@boston.gov
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
The scope includes wall, ceiling and floor finishes; HVAC distribution; and power, lighting and Fire Alarm modifications. Access in certain areas of the site may be provided to allow work to begin as early as May 1, 2018, but the majority of the work shall be performed between June 20, 2018 and August 24, 2018
Ship-to Address:
PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
Bill-to Address:
PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
Print Format:
Bid Print
File Attachments:
7085A Boston Arts Academy Enabling Swing Space Project
Form Attachments:
Required Quote Attachments
Item Information
1-5 of 14
1
2
3
Item # 1: ( 72-15 - 30 )
Project description: The work includes renovations and modifications to selective areas within the Grover Cleveland School at 11 Charles Street, Dorchester, to accommodate the temporary relocation of the Boston Arts Academy during construction of the new Boston Arts Academy building at 174 Ipswich Street. The scope includes wall, ceiling and floor finishes; HVAC distribution; and power, lighting and Fire Alarm modifications. Access in certain areas of the site may be provided to allow work to begin as early as May 1, 2018, but the majority of the work shall be performed between June 20, 2018 and August 24, 2018
U N S P S C Code:
72-15-30
Glass and glazing services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 72-15 - 21 )
Project description: The work includes renovations and modifications to selective areas within the Grover Cleveland School at 11 Charles Street, Dorchester, to accommodate the temporary relocation of the Boston Arts Academy during construction of the new Boston Arts Academy building at 174 Ipswich Street. The scope includes wall, ceiling and floor finishes; HVAC distribution; and power, lighting and Fire Alarm modifications. Access in certain areas of the site may be provided to allow work to begin as early as May 1, 2018, but the majority of the work shall be performed between June 20, 2018 and August 24, 2018
U N S P S C Code:
72-15-21
Acoustical and insulation services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 72-15 - 25 )
Project description: The work includes renovations and modifications to selective areas within the Grover Cleveland School at 11 Charles Street, Dorchester, to accommodate the temporary relocation of the Boston Arts Academy during construction of the new Boston Arts Academy building at 174 Ipswich Street. The scope includes wall, ceiling and floor finishes; HVAC distribution; and power, lighting and Fire Alarm modifications. Access in certain areas of the site may be provided to allow work to begin as early as May 1, 2018, but the majority of the work shall be performed between June 20, 2018 and August 24, 2018
U N S P S C Code:
72-15-25
Floor laying services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 4: ( 72-10 - 27 )
Project description: The work includes renovations and modifications to selective areas within the Grover Cleveland School at 11 Charles Street, Dorchester, to accommodate the temporary relocation of the Boston Arts Academy during construction of the new Boston Arts Academy building at 174 Ipswich Street. The scope includes wall, ceiling and floor finishes; HVAC distribution; and power, lighting and Fire Alarm modifications. Access in certain areas of the site may be provided to allow work to begin as early as May 1, 2018, but the majority of the work shall be performed between June 20, 2018 and August 24, 2018
U N S P S C Code:
72-10-27
Flooring service
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 5: ( 72-10 - 24 )
Project description: The work includes renovations and modifications to selective areas within the Grover Cleveland School at 11 Charles Street, Dorchester, to accommodate the temporary relocation of the Boston Arts Academy during construction of the new Boston Arts Academy building at 174 Ipswich Street. The scope includes wall, ceiling and floor finishes; HVAC distribution; and power, lighting and Fire Alarm modifications. Access in certain areas of the site may be provided to allow work to begin as early as May 1, 2018, but the majority of the work shall be performed between June 20, 2018 and August 24, 2018
U N S P S C Code:
72-10-24
Painting and paper hanging
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
1-5 of 14
1
2
3
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status