You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-17-1895-HGE00-HGE01-26231
Header Information
Bid Number:
BD-17-1895-HGE00-HGE01-26231
Description:
Contract #18-09 - No. 2 Overflow Drain Gate Replacement
Bid Opening Date:
05/14/2018 11:00:00 AM
Purchaser:
Tanya E. Roman
Organization:
Holyoke Gas & Electric
Department:
HGE001 - Holyoke Gas & Electric
Location:
HGE01 - Holyoke Gas & Electric
Fiscal Year:
17
Type Code:
NS
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
04/19/2018 02:24:42 PM
Info Contact:
Yocelyn F. Delgado, Purchasing Coordinator (Email: ydelgado@hged.com)
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A mandatory pre-bid meeting is scheduled for May 2, 2018 at 10:00 a.m. at 28 Gatehouse Road, Holyoke, MA.
Bulletin Desc:
No. 2 Overflow Drain Gate Replacement - work includes fabrication and installation of two (2) new 48"x48" drain gates, operators and platform for No. 2 Overflow via removal of the existing gates and operators and installation of new gates, operators and support structures.
Ship-to Address:
Chi Wong
99 Suffolk Street
Holyoke, MA 01040
US
Email: cwong@hged.com
Phone: (413)536-9308
FAX: (413)552-9315
Bill-to Address:
Chi Wong
99 Suffolk Street
Holyoke, MA 01040
US
Email: cwong@hged.com
Phone: (413)536-9308
FAX: (413)552-9315
Print Format:
Bid Print
Required Quote Attachments
Item Information
Item # 1: ( 31-33 - 00 )
The invitation for bid (IFB) and contract are subject to MGL c.30 s.39M. A mandatory pre-bid meeting is scheduled to begin promptly at 10:00 a.m. on Wednesday, May 2, 2018 at 28 Gatehouse Road, Holyoke, MA. All Bidders are required to submit a bid deposit equal to 5% of the total value of their bid. Prevailing wage rates apply. The successful bidder will be required to furnish payment and performance bonds each equal to 100% of the total contract value.
U N S P S C Code:
31-33-00
Fabricated structural assemblies
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status